Permit Number: T06BU00868
Parcel: 136328070

Review Status: Completed

Review Details: GRADING

Permit Number - T06BU00868
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/23/2006 ANDREW CONNOR NPPO REVIEW Denied Note on plan: This site is subject to the provisions provided in the CITY OF TUCSON DEVELOPMENT STANDARD NO. 9-04.3.2.A & B HILLSIDE DEVELOPMENT SITE IMPROVEMENT

Vegetation Retention and Revegetation.

A. Vegetation Retention.

1. Existing trees with four (4) inch or greater trunk diameter and cacti will be preserved in their original locations, except for building sites and access and utilities serving building sites.

2. When retention of the above trees and cacti in their original locations is not possible due to building site location, the trees and cacti will be salvaged and replanted in areas requiring revegetation, whenever possible.

B. Revegetation. All cut or fill slopes, which are no steeper than three horizontal to one vertical (3:1) and all utility trenches or septic leaching fields which are not located in parking or driveway areas will be revegetated in compliance with the following requirements.

1. All plants used in revegetation must be the same as the native vegetation on the site or any adjacent site prior to grading or clearing.

2. Revegetation will be accomplished with the following minimum requirements for plants.

a. Desert trees, a minimum of fifteen (15) gallon size with a minimum trunk diameter of two (2) inches measured at the soil level, or large specimen cactus will be placed at the same vegetation density found on the site prior to any clearing, grubbing, or grading.

b. Seeds for trees, desert shrubs, and grasses will be planted with a density adequate to control erosion and may use one of the following methods of planting or any other method approved by the Zoning Review Section at DSD.

1) Raked into the soil with appropriate mulch materials;
2) Hydroseeding;
3) Anchored mulches; or
4) Established on jute, rolled straw, or similar material.

3. A temporary watering system must be installed until the revegetation materials are established.
05/23/2006 ANDREW CONNOR ZONING REVIEW Needs Review
06/22/2006 AKLAPPE1 ENGINEERING REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
06/22/2006 AMERY KLAPPERT OUT TO CUSTOMER Completed