Permit Review Detail
Review Status: Completed
Review Details: REVISION - GRADING
Permit Number - T06BU00830
Review Name: REVISION - GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/16/2009 | TERRY STEVENS | ZONING | REVIEW | Denied | 03/16/09 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the grading plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next grading plan submittal. 3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved and stamped site plan. Additional comments may be forthcoming. |
03/18/2009 | ANDREW CONNOR | NPPO | REVIEW | Denied | 1. All disturbed, grubbed, graded, or bladed areas not otherwise improved shall be landscaped, reseeded, or treated with an inorganic or organic ground cover to help reduce dust pollution LUC 3.7.2.7 2. For any site one acre or greater or portion thereof which has been wholly or partially grubbed or wholly or partially graded, construction shall commence and shall be continuous within sixty (60) days after grubbing. Should construction or grading not commence or be continuous within the required sixty- (60) day period, the site shall be native seeded within thirty (30) days following the expiration of the required sixty (60) day period DS 11-01.2.3.A. Indicate if Phase 2 is to be left in a natural state or indicate treatment of exposed grubbed or grated area. 3. Ensure that all Engineering & Zoning comments and concerns are addressed. |
04/06/2009 | PAUL MACHADO | ENGINEERING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/09/2009 | CPIERCE1 | OUT TO CUSTOMER | Completed |