Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T06BU00766
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/19/2006 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Denied | DATE: April 19, 2006 TO: AC Tsang PE SUBJECT: Huachuca Apartments D05-0010 Grading Plan submittal Engineering Review REVIEWER: Elizabeth Eberbach ACTIVITY NUMBER: T06BU00766 SUMMARY: The Grading Plan, drainage report, geotechnical report, and SWPPP were received by Development Services Department. Development Services Department Engineering Division has reviewed the received items and does not recommend approval of the Grading Plan at this time. GRADING PLAN COMMENTS: 1) Tucson Code Section 26-7: Regarding the erosion hazard setback erosion protection for this proposed development, provide a detail of the upstream protection to show how scour and erosion is prevented from affected building 13 during 100-year event. 2) DS Sec.10-01.3.5.1.5: Regarding the soils report, address the following: a) DS Sec.2-05.2.3.D: Provide and label specific recommendations for the addressing the closure of the open, underground water encachements and wells. 3) It will be necessary to show how drainage enters basin C without draining through the dumpster enclosure. Further comments to be posted. Resubmittal is required. Submit revised Grading Plan, and response letter. If you have questions, call me at 791-5550, extension 2204. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services Department |
| 04/22/2006 | DAVID RIVERA | ZONING | REVIEW | Denied | 04/22/06 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the grading plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next grading plan submittal. 3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved site/development plan. Additional comments may be forthcoming. 4. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the approved development plan, landscape and NPPO plans are to be submitted with the grading plans packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval. 5. On the grading plan, draw and label the access ramps at the driveway entrance as depicted on the development plan. Also draw and label the bicycle parking facility as depicted on the development plan. |
| 04/25/2006 | ANDREW CONNOR | NPPO | REVIEW | Denied | Submit stamped approved development plan including landscape and NPP plans, review will continue upon re-submittal of requested documents. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/23/2006 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 05/23/2006 | SUE REEVES | REJECT SHELF | Completed |