Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T06BU00669
Parcel: 11627504B

Review Status: Completed

Review Details: GRADING

Permit Number - T06BU00669
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/04/2006 ANDREW CONNOR NPPO REVIEW Denied Plans shall be of sufficient clarity to indicate the nature and extent of the work proposed per DS 11-01.4.1.C. Clearly identify grading limits of project on the site / grading plan.
04/18/2006 ELIZABETH EBERBACH ENGINEERING REVIEW Approved DATE: April 18, 2006
SUBJECT: Starr Pass Grading Plan Engineering Review
LOCATION: T14S R13E Section 17
REVIEWER: Elizabeth Eberbach
ACTIVITY NUMBERS: T06BU00669, T06OT00774

SUMMARY: The Grading Plan with a copy of the approved Tentative Plat were reviewed by Engineering. Engineering recommends approval of the project with the following conditions added to the permits:

GRADING PLAN CONDITIONS:
1) Extents of disturbance for this proposed improvements shall be fenced at the site. Fencing will not be placed within the floodplain limits.
2) Interim erosion control devices shall be placed at downstream end of disturbance between disturbance limits and wash area.
3) Any proposed sanitary sewer systems shall be constructed to prevent disease, contamination, and unsanitary conditions due to flooding and/or erosion. Area surrounding comfort structure shall be graded so as to not provide direct discharge of sanitary effluent to the wash.
4) An engineering grading pre-construction meeting shall be set up prior to grading construction of improvements under this proposed project.
5) Except as otherwise provided in the Floodplain Ordinance regulations, it shall be unlawful for any person to establish, erect, alter or relocate a use or structure in the regulatory floodplain or an erosion-prone area as described in Tucson Code section 26-11.1(2) without first obtaining a floodplain use permit from the city engineer.
6) It shall be unlawful for any person to perform any grading operation in or alteration of any watercourse in violation of the Floodplain Ordinance.

There is no resubmittal required. Pick up permits after approvals from all review entities have been completed. You may call me if you have any questions, at 791-5550 extension 2204.

Elizabeth Eberbach, PE, CPM
Civil Engineer
Engineering Division
Development Services
04/22/2006 DAVID RIVERA ZONING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
05/25/2006 GBONILL1 OUT TO CUSTOMER Completed
05/25/2006 SUE REEVES REJECT SHELF Completed