Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T06BU00578
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/28/2006 | ANDREW CONNOR | NPPO | REVIEW | Denied | Site plan approval is necessary to continue review. |
| 04/01/2006 | PATRICIA GILBERT | ENGINEERING | REVIEW | Denied | DATE: April 14, 2006 ACTIVITY NUMBER: T06BU00578 PROJECT NAME: Aloft Hotel PROJECT ADDRESS: 1900East Speedway Blvd. PROJECT REVIEWER: Patricia Gilbert The following items must be revised or added to the grading plan. Please include a response letter with the next submittal that states how all comments have been addressed. RESUBMITTAL REQUIRED: GRADING PLAN, DRAINAGE STATEMENT SWPPP is acceptable. Once the grading plan is close to approval submit 4 copies of the SWPPP with the grading plans. 1. A copy of the stamped approved Site Plan must be included with the Grading Plan submittal. 2. The Site Plan is currently in review. Any changes made to the Site Plan must be reflected on the Grading Plan. The Site Plan and Grading Plan must match. 3. Indicate building roof slope/drainage (flow arrows), downspouts and sidewalk scuppers. DS 2-02.2.1.A.16 4. Provide a detail of the existing trench drain (to remain) that is located on the northeast corner of the property. Please clarify the exact location of the existing trench drain. Is the trench drain in the underground garage or located above ground? 5. Provide sidewalk along Norris Ave and First Street. See site plan comments regarding sidewalk along a local street. 6. Provide a typical cross-section through the south parking lot. 7. Provide a typical cross-section through the front entrance area of the hotel, show the cross-section from the building to the ROW (Speedway Blvd). 8. Provide a typical cross-section through the entrance of the under ground garage, show th eheight of the wall, changes in elevation and adjacent landscape areas. 9. Provide a typical cross-section through the alley (PAAL). Show the cross-section from the building through to the parking spaces on the south. DRAINAGE STATEMENT 1. Address in the statement how the drainage directed to the underground garage will be addressed under a storm event. Is there a pump to pump stormwater out of the parking garage? Does the existing trench drain provide relief? Clarify and illustrate in the statement . |
| 04/22/2006 | DAVID RIVERA | ZONING | REVIEW | Denied | 04/22/06 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the grading plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next grading plan submittal. 3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved and stamped site plan. Additional comments may be forthcoming. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/22/2006 | AMERY KLAPPERT | OUT TO CUSTOMER | Completed |
| 05/22/2006 | SUE REEVES | REJECT SHELF | Completed |