Review Date Reviewer's Name Type of Review Description Status Comments
03/20/2006 ANDREW CONNOR NPPO REVIEW Denied Include all of the following notes on the grading plan: This site is subject to the provisions provided in the CITY OF TUCSON DEVELOPMENT STANDARD NO. 9-04.3.2.A & B HILLSIDE DEVELOPMENT SITE IMPROVEMENT

Vegetation Retention and Re-vegetation.

A. Vegetation Retention.

1. Existing trees with four (4) inch or greater trunk diameter and cacti will be preserved in their original locations, except for building sites and access and utilities serving building sites.

2. When retention of the above trees and cacti in their original locations is not possible due to building site location, the trees and cacti will be salvaged and replanted in areas requiring revegetation, whenever possible.

B. Re-vegetation. All cut or fill slopes, which are no steeper than three horizontal to one vertical (3:1) and all utility trenches or septic leaching fields which are not located in parking or driveway areas will be re-vegetated in compliance with the following requirements.

1. All plants used in revegetation must be the same as the native vegetation on the site or any adjacent site prior to grading or clearing.

2. Re-vegetation will be accomplished with the following minimum requirements for plants.

a. Desert trees, a minimum of fifteen (15) gallon size with a minimum trunk diameter of two (2) inches measured at the soil level, or large specimen cactus will be placed at the same vegetation density found on the site prior to any clearing, grubbing, or grading.

b. Seeds for trees, desert shrubs, and grasses will be planted with a density adequate to control erosion and may use one of the following methods of planting or any other method approved by the Zoning Review Section at DSD.

· Raked into the soil with appropriate mulch materials;
· Hydro-seeding;
· Anchored mulches; or
· Established on jute, rolled straw, or similar material.

3. A temporary watering system must be installed until the re-vegetation materials are established.

4. Fencing shall be required during construction per DS 2-06.8.0 Fig.1 for all undisturbed natural desert areas of Protected Native Plants and for individual Protected Native Plants to be preserved-in-place. The area to be fenced shall be beyond the "drip-line" of the vegetation by one-half (½) the distance of the "drip-line" radius. For Saguaros and cacti, the area to be fenced shall be equal to the distance of one-half (½) the height of the plant per DS 2-15.6.0.

5. NPPO pre permit inspection is required prior to grading inspection can be scheduled by calling IVR system and entering inspection code 09015 or calling Landscape Field Representative directly @ 791-5550 EXT 1140
03/28/2006 PAUL MACHADO ENGINEERING REVIEW Denied To: Paul Nzomo, P. E. DATE: March 28, 2006
Coronado Engineering & Development, Inc.
1010 N. Finance Drive
Tucson, Arizona 85705
SUBJECT: 10845 E. Placita Marimba
Grading Plan T06BU00450 (First Review)
T14S, R15E, Section 36

RESUBMITTAL REQUIRED: Grading Plan, Drainage Statement.

The Grading Plan (GP) and Drainage Statement (DS) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Grading Plan:

1. Please include a response letter to the comments along with the corrected copies of the GP.
2. List GP number (T06BU00450) on the plans
3. Show all symbols in the legend.
4. List all Cut and Fill quantities in cubic yards. If both are 0 cy, please list.
5. Delineate 100-year W.S.E.L. across the D/W to demonstrate all weather access.
6. Call out the names of all washes.
Drainage Statement:
1. Please include a response letter to the comments along with the corrected copies of the DS.
2. A Drainage Statement is a brief description of drainage conditions applicable for a site which are not affected by 100 year flows of 100 cfs, of more……per S.M.D.D.F.M., chap. II, 2.1.2. The DS must be submitted along with the site plan and accepted with the approval of the grading plan.
3. The content and format of the Drainage Statement should follow S.M.D.D.F.M., chap. II, 2.2.
4. Show the project address or administration address on the cover sheet of the DS.

If you have any questions, I can be reached at 791-5550 x1193 or Paul.Machado@tucsonaz.gov
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 791-5550 x1193 office
(520) 879-8010 fax
C:/10845 E. Placita Marimba Grad
04/22/2006 DAVID RIVERA ZONING REVIEW Denied 04/22/06

Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the grading plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped site plans with the next grading plan submittal.

3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the zoning approved and stamped site plan. Additional comments may be forthcoming.

Final Status

Task End Date Reviewer's Name Type of Review Description
05/01/2006 CINDY AGUILAR OUT TO CUSTOMER Completed
05/01/2006 SUE REEVES REJECT SHELF Completed