Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T06BU00323
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/06/2006 | PETER MCLAUGHLIN | NPPO | REVIEW | Denied | Site plan and landscape plan approval required prior to grading plan approval. |
| 03/09/2006 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | DATE: March 10, 2006 TO: Stephen Magelli, OPW Engineering, LLC SUBJECT: Site Plan: Commercial Parking Lot Expansion, 2320 E Aragon Street REVIEWER: Loren Makus ACTIVITY NUMBER: T06CM00848 SUMMARY: The Site Plan was reviewed by Development Services Department, Engineering Division on March 9, 2006. It was not approved. Please address the following comments. Site Plan/Grading Plan Comments: 1. A floodplain use permit is required for this project. Provide a completed floodplain use permit along with the $50 application fee and $150 hydrology review fee. (Tucson Code Chapter 26-11.2) 2. Show how water harvesting will be maximized by directing drainage to landscape areas to the maximum extent possible. 3. Show on the plan how the retention and detention requirements will be met. 4. Show and label water surface contours along the wash. The contours Drainage/Hydrologic/Hydraulic Report 5. Provide a copy of the previously approved Drainage Report. The drainage report must address the retention and detention requirements of the site, including the expansion area. The project is within a balanced basin so retention and detention must be provided. Stormwater Pollution Prevention Plan: 6. Part IV.C.2.c. Clarify the total area of site and estimate of total area expected to be disturbed. Clarify on the Site Plan/Grading Plan whether this is a new project or a revision to the previously approved project. 7. Part IV.C.2.e. Include and identify receiving waters in the general location map. It appears that the receiving waters for the new project area is the unnamed tributary of the Airport Wash that traverses the property. 8. Part IV.C.3.a. Identify on the map drainage patterns and estimated slopes after grading. 9. Part IV.C.3.b. Identify on the map areas of soil disturbance Identify on the map areas not to be disturbed 10. Part IV.C.3.g. Identify on the map locations where stormwater is discharged to a surface water (e.g. ephemeral waters or dry washes) and to MS4s. The additional paved area seems to sheet flow into the on-site wash. 11. Part IV.C.4. Identify on the map or in a narrative, the nearest receiving water(s), including ephemeral and intermittent streams, dry sloughs, arroyos. 12. Part IV.D.2.a. Describe the erosion and sediment controls designed to retain sediment on site to the extent practicable. Provide sediment controls along the south bank of the wash 13. Part IV.F. Include copy of the NOI and ADEQ authorization as part of the SWPPP. 14. Part IV.J.1. Each Operator must sign the SWPPP. Revise the Site Plan/Grading Plan, to address all of these comments and resubmit four copies for review along with three copies of the revised SWPPP. Include a letter explaining how each comment has been addressed. Also submit a copy of the previously approved Drainage Report. If you have any questions or if you wish to discuss any of these comments, I can be reached at 520.791-5550 ext 1161 or by email at loren.makus@tucsonaz.gov. Loren Makus, E.I.T. Senior Engineering Associate Engineering Division Development Services |
| 04/09/2006 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | Site plan approval is required prior to grading plan approval. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/19/2006 | SUE REEVES | APPROVAL SHELF | Completed |
| 04/19/2006 | ADRIANNE OLIVO | OUT TO CUSTOMER | Completed |