Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T06BU00323
Parcel: 140420520

Address:
2320 E ARAGON RD

Review Status: Completed

Review Details: GRADING

Permit Number - T06BU00323
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/06/2006 PETER MCLAUGHLIN NPPO REVIEW Denied Site plan and landscape plan approval required prior to grading plan approval.
03/09/2006 LOREN MAKUS ENGINEERING REVIEW Denied DATE: March 10, 2006
TO: Stephen Magelli, OPW Engineering, LLC
SUBJECT: Site Plan: Commercial Parking Lot Expansion, 2320 E Aragon Street
REVIEWER: Loren Makus
ACTIVITY NUMBER: T06CM00848

SUMMARY: The Site Plan was reviewed by Development Services Department, Engineering Division on March 9, 2006. It was not approved. Please address the following comments.

Site Plan/Grading Plan Comments:
1. A floodplain use permit is required for this project. Provide a completed floodplain use permit along with the $50 application fee and $150 hydrology review fee. (Tucson Code Chapter 26-11.2)
2. Show how water harvesting will be maximized by directing drainage to landscape areas to the maximum extent possible.
3. Show on the plan how the retention and detention requirements will be met.
4. Show and label water surface contours along the wash. The contours
Drainage/Hydrologic/Hydraulic Report
5. Provide a copy of the previously approved Drainage Report. The drainage report must address the retention and detention requirements of the site, including the expansion area. The project is within a balanced basin so retention and detention must be provided.
Stormwater Pollution Prevention Plan:
6. Part IV.C.2.c. Clarify the total area of site and estimate of total area expected to be disturbed. Clarify on the Site Plan/Grading Plan whether this is a new project or a revision to the previously approved project.
7. Part IV.C.2.e. Include and identify receiving waters in the general location map. It appears that the receiving waters for the new project area is the unnamed tributary of the Airport Wash that traverses the property.
8. Part IV.C.3.a. Identify on the map drainage patterns and estimated slopes after grading.
9. Part IV.C.3.b. Identify on the map areas of soil disturbance Identify on the map areas not to be disturbed
10. Part IV.C.3.g. Identify on the map locations where stormwater is discharged to a surface water (e.g. ephemeral waters or dry washes) and to MS4s. The additional paved area seems to sheet flow into the on-site wash.
11. Part IV.C.4. Identify on the map or in a narrative, the nearest receiving water(s), including ephemeral and intermittent streams, dry sloughs, arroyos.
12. Part IV.D.2.a. Describe the erosion and sediment controls designed to retain sediment on site to the extent practicable. Provide sediment controls along the south bank of the wash
13. Part IV.F. Include copy of the NOI and ADEQ authorization as part of the SWPPP.
14. Part IV.J.1. Each Operator must sign the SWPPP.

Revise the Site Plan/Grading Plan, to address all of these comments and resubmit four copies for review along with three copies of the revised SWPPP. Include a letter explaining how each comment has been addressed. Also submit a copy of the previously approved Drainage Report. If you have any questions or if you wish to discuss any of these comments, I can be reached at 520.791-5550 ext 1161 or by email at loren.makus@tucsonaz.gov.
Loren Makus, E.I.T.
Senior Engineering Associate
Engineering Division
Development Services
04/09/2006 PETER MCLAUGHLIN ZONING REVIEW Denied Site plan approval is required prior to grading plan approval.

Final Status

Task End Date Reviewer's Name Type of Review Description
04/19/2006 SUE REEVES APPROVAL SHELF Completed
04/19/2006 ADRIANNE OLIVO OUT TO CUSTOMER Completed