Permit Review Detail
Review Status: Completed
Review Details: REVISION - GRADING
Permit Number - T06BU00190
Review Name: REVISION - GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/16/2006 | ANDREW CONNOR | NPPO | REVIEW | Denied | Verify that re-vegetation per plan associated with Case # T02BU00170 is under construction or has been completed call Andrew Connor Landscape Field Representative directly @ 791-5550 EXT 1140 for clarification. |
| 12/11/2006 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | CDRC TRANSMITTAL FROM: Michael St.Paul, Planning Technician PROJECT: T06BU00190 Revision Grading Lot 71 Montage Vista II S00-023 TRANSMITTAL: December 11, 2006 COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. The reference set was provided without the actual revision set. NPPO and Engineering approval is required prior to approval from Zoning. |
| 12/28/2006 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Denied | TO: Allied Homes c/o Carl Ewing RA SUBJECT: Montage Vista II Lot 71 resubmittal Grading Review LOCATION: 3172 W Salvia Drive REVIEWER: Elizabeth Eberbach ACTIVITY NUMBERS: T06BU00190-R SUMMARY: Engineering Division of Development Services Department has received and reviewed the revised grading plan for lot 71 and does not recommend approval of the grading plan at this time. GRADING PLAN COMMENTS: 1) LUC Sec.2.8.1.2.E: For the south slope, there is a proposed fill area that depicts slopes steeper than 2:1(H:V) south of the fill. A geotechnical assessment letter dated May 28, 2005 restricts slopes greater than 2:1(H:V). Explain intent, provide geotechnical acceptance of slope grade and provide erosion protection details for the north side of this slope. Any rip rap shall be handplaced per HDZ grading standards. IT may be necessary to provide additional sections along this embankment for clarification. 2) DS Sec.11-01.4.1.C: Provide more legible contour lines on plan sheets. For resubmittal, provide 4 copies of the revised grading plans, geotechnical assessment or other supporting documents, and a response letter. If you have any questions, I can be reached at 791-5550, extension 2204. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/30/2007 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
| 01/30/2007 | SUE REEVES | REJECT SHELF | Completed |