Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T06BU00190
Parcel: 116094190

Address:
3172 W SALVIA DR

Review Status: Completed

Review Details: REVISION - GRADING

Permit Number - T06BU00190
Review Name: REVISION - GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/16/2006 ANDREW CONNOR NPPO REVIEW Denied Verify that re-vegetation per plan associated with Case # T02BU00170 is under construction or has been completed call Andrew Connor Landscape Field Representative directly @ 791-5550 EXT 1140 for clarification.
12/11/2006 MICHAEL ST. PAUL ZONING REVIEW Denied CDRC TRANSMITTAL


FROM: Michael St.Paul, Planning Technician

PROJECT:
T06BU00190 Revision
Grading Lot 71 Montage Vista II
S00-023


TRANSMITTAL: December 11, 2006


COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.


The reference set was provided without the actual revision set.

NPPO and Engineering approval is required prior to approval from Zoning.
12/28/2006 ELIZABETH EBERBACH ENGINEERING REVIEW Denied TO: Allied Homes c/o Carl Ewing RA
SUBJECT: Montage Vista II Lot 71 resubmittal Grading Review
LOCATION: 3172 W Salvia Drive
REVIEWER: Elizabeth Eberbach
ACTIVITY NUMBERS: T06BU00190-R

SUMMARY: Engineering Division of Development Services Department has received and reviewed the revised grading plan for lot 71 and does not recommend approval of the grading plan at this time.

GRADING PLAN COMMENTS:
1) LUC Sec.2.8.1.2.E: For the south slope, there is a proposed fill area that depicts slopes steeper than 2:1(H:V) south of the fill. A geotechnical assessment letter dated May 28, 2005 restricts slopes greater than 2:1(H:V). Explain intent, provide geotechnical acceptance of slope grade and provide erosion protection details for the north side of this slope. Any rip rap shall be handplaced per HDZ grading standards. IT may be necessary to provide additional sections along this embankment for clarification.
2) DS Sec.11-01.4.1.C: Provide more legible contour lines on plan sheets.

For resubmittal, provide 4 copies of the revised grading plans, geotechnical assessment or other supporting documents, and a response letter. If you have any questions, I can be reached at 791-5550, extension 2204.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services

Final Status

Task End Date Reviewer's Name Type of Review Description
01/30/2007 GERARDO BONILLA OUT TO CUSTOMER Completed
01/30/2007 SUE REEVES REJECT SHELF Completed