Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T06BU00093
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/28/2006 | DOUG LAAKSO | BUILDING-COMMERCIAL | REVIEW | Approv-Cond | |
03/16/2006 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approved | |
03/20/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | The proposed design for the installation of the drinking fountain indicates that an eight cubic foot gravel sump is being provided for drainage. The manufacturer's installation instructions call for 30-cubic feet of gravel. Provide information to show that the proposed design will provide adequate drainage. |
04/22/2006 | DAVID RIVERA | ZONING | REVIEW | Denied | 04/22/06 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. Zoning has reviewed the building plans but cannot approve them at this time. It is not clear if a seprate development plan or if the approved tentative plat was required for the development of this park. Please contact Patricia Gehlen at 791-5608 ext. 1179 for more information. If a copy of the approved tentative plat is required please include the plat with the next building plan submittal. It may be possible that Zoning may approve the building plans over the counter through Patricia Gehlen or myself based on the type of site approval required. 2. Provide with the building plans the following that applies to this development. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the CDRC approved tentative plat/development plan, landscape and NPPO plans are to be submitted with the grading plan packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The tentative plat/development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval. 3. Zoning will re-review and approve the building plans on the next submittal providing the stamped and approved site plans are included with the building plan package and the building structural portions of the plan review have been approved. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/28/2006 | ADRIANNE OLIVO | OUT TO CUSTOMER | Completed |
04/28/2006 | SUE REEVES | REJECT SHELF | Completed |