Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T06BU00043
Parcel: 12908021G

Address:
1239 S CHERRY AV

Review Status: Completed

Review Details: GRADING

Permit Number - T06BU00043
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/28/2006 PATRICIA GILBERT ENGINEERING REVIEW Denied DATE: January 28, 2006
ACTIVITY NUMBER: T06BU00043
PROJECT NAME: The Bottle Shop
PROJECT ADDRESS: 1239 South Cherry Avenue
PROJECT REVIEWER: Patricia Gilbert

The following items must be revised or added to the grading plan. Please include a response letter with the next submittal that states how all comments have been addressed.

RESUBMITTAL REQUIRED: 3 COPIES OF THE GRADING PLAN AND SWPPP

APPROVED: DRAINAGE STATEMENT

1. A copy of the stamped approved Site Plan must be included with the Grading Plan submittal.

2. The Site Plan is currently in review. Any changes made to the Site Plan must be reflected on the Grading Plan. The Site Plan and Grading Plan must match.

3. The grading plan indicates grading to match existing grades outside the property line along Cherrybell Stravenue. Be advised that a Right of Way (ROW) Permit will be required for any work within the ROW.

4. On the grading application the fill quantities read 115 cubic yards. On the grading plan Sheet C2 the fill quantities read 511 cubic yards. Which is correct? Please address in your response letter and appropriately on the grading plan.

5. Clearly indicate area of disturbance on the grading plan. If a line weight is used, indicate the line weight in the legend.

6. Under the General notes on sheet C2 include the total site area and the area of disturbance.

7. The project is going be phased. Indicate on the grading plan the phasing and label appropriately.

8. Show roof drainage (flow arrows). DS 2-02.2.1.A.16

9. Provide erosion protection underneath the roof down spout located on the west side of the building.

10. Provide a cross section detail through the landscape border. Include the ROW and the Building. Provide appropriate dimensions and label accordingly. If curb and sidewalk are located within the ROW include in the detail. (See comment 11)

11. Show the depth of the water harvesting areas in the landscape border. Either by a general note or label on the plan. (See comment 10)

12. Indicate on each concentration point that the calculated 100 year flow (Q100) amounts are existing.

13. Include the existing and proposed overall site 100 year flow (Q100) amounts found in the drainage statement, under the section Onsite Hydrology, second paragraph.

SWPPP COMMENTS

1. Provide signatures for the Owner/Operator Certification on page 2.
01/30/2006 ANDREW CONNOR NPPO REVIEW Denied Submit stamped approved site and landscape plans, review will continue upon re-submittal of approved documents.
02/19/2006 DAVID RIVERA ZONING REVIEW Denied 02/19/06

Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the grading plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next grading plan submittal.

3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved and stamped site plan. Additional comments may be forthcoming.

Final Status

Task End Date Reviewer's Name Type of Review Description
02/28/2006 GBONILL1 OUT TO CUSTOMER Completed
02/28/2006 SUE REEVES REJECT SHELF Completed