Plan Review Detail
Review Status: Completed
Review Details: PIA RESUBMITTAL
Plan Number - T05PI00043
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/07/2006 | DALE KELCH | DOT TRAFFIC | REVIEW | Denied | Traffic Engineering REJECTS this PIA submittal: 1. The note on 3/5 that states "Existing traffic signal/pole (mast arm) & pull box to be relocated by DOT" is not acceptable. The Developer is required to install a right turn lane as a rezoning condition. A signal relocation that is necessitated as a result of the turn lane installation is incumbent on the Developer to relocate. Revise note to reflect Developer responsibility to relocate signal pole. D. Dale Kelch, PE Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dale.kelch@tucsonaz.gov |
03/08/2006 | Richard Leigh | DOT ENGINEERING | REVIEW | Denied | Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following review comments need to be addressed in the next submittal. 1. Sheet 3: Change the reference from CMP to RCP for the pipe crossing pedestrian paths. 2. Submit approval from the COT Parks and Recreation Department for the proposed location and configuration of the pedestrian pathways. If you have any questions, I can be reached at 791-3115 ext.448 or Richard.Leigh@tucsoz.gov |
03/09/2006 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
03/10/2006 | THAUSER1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
03/10/2006 | THAUSER1 | ENGINEERING | REVIEW | Needs Review | |
03/10/2006 | THAUSER1 | UTILITY CLEARANCES | COT STREETS DIVISION | Needs Review | Submit Utility Clearance Letters. |
03/10/2006 | THAUSER1 | CONSTRUCTION ESTIMATE | REVIEW | Needs Review | |
03/10/2006 | THAUSER1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
03/10/2006 | THAUSER1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | Submit Utility Clearance Letters. |
03/10/2006 | THAUSER1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | Submit Utility Clearance Letters. |
03/10/2006 | THAUSER1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | Submit Utility Clearance Letters. |
03/10/2006 | THAUSER1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | Submit Utility Clearance Letters. |
03/10/2006 | THAUSER1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | Submit Utility Clearance Letters. |
03/10/2006 | THAUSER1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | Submit Utility Clearance Letters. |
03/10/2006 | THAUSER1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | Submit Utility Clearance Letters. |
03/10/2006 | THAUSER1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review | Submit Utility Clearance Letters. |