01/06/2006 TACHONG1 DOT ENGINEERING UTILITY AWARENESS NOTIFICATION Completed SUBJECT: La Cholla Landing, S03-038
PIA Plan T05PI00039

PROJECT REVIEWER: Blanca Espino,Section

PIA Plan
1. Please include a response letter with the next submittal that states how all comments have been addressed. Include plans/redlines from previous plan submittal.

2. See Redlines for detailed information requiring corrections.

3. Sheet 1, A copy of the required "Title Block" is attached. Correct and revise.

4. Sheet 1, Indicate Plan No. I-2005-065 on all sheets.

5. Sheet 1, Delete line; ACCEPTED: C.O.T. Traffic Engineering and date.

6. Sheet 1, Indicate Maps and Plats, Book and Page on cover sheet. Plat must be recorded before submittal of mylars for final review and approval.

7. Sheet 1, Indicate Administrative address on cover sheet.

8. Sheet 1, Add note: The Engineer of Record shall submit to the City for acceptance any changes to the approved plans prior to construction. Additionally, the Engineer of Record shall certify all changes meeting all applicable standards, codes, and ordinances.

9. Sheet 1, Add note to General or Paving Notes: Engineer of Record must provide written documentation that all utilities within the right of way have been cleared for construction.

10. Sheet 1, Add note: The City shall not be held liable for any errors and/or omissions on these plans. Items not meeting City Standards shall be repaired/replaced at no cost to the City.

11. Sheet 1, Add note to General or Paving Notes: All Drainage infrastructures, indicated on the plans, are in accordance to the approved Drainage Report approved by Development Services Department.

12. Sheet 1, Add note: An excavation permit shall be obtained from the City of Tucson Transportation Department prior to any work within the Public right-of-way.

13. Sheet 1, Add note to General or Paving Notes: Floodplain Use Permit No._______, has been issued by Development Services Department for work impacting City and FEMA Floodplains.

14. Sheet 3, Construction Notes # 18; A depressed curb opening is not acceptable. Sidewalk scuppers are required as per D.S. 3-01.4.4.F Correct and revise.

15. Sheet 4, Construction Notes # 16; A depressed curb opening is not acceptable. Sidewalk scuppers are required as per D.S. 3-01.4.4.F Correct and revise.

16. Sheet 5, Depressed Wedge Curb/ Opening Detail is not acceptable. Sidewalk scuppers are required. Correct and revise.

17. Prior to Mylar submittal, Utility Clearance Letters are required to be completed and returned to DSD PIA coordinator.

18. Minimum size and type of storm drainpipe allowed within right of way is 18" R.C.P.
12/01/2005 GARY WITTWER DOT LANDSCAPE REVIEW Denied Please submit a copy of your approve NPPO plan for the site. I will also need to see your planting/irrigation plan for common areas. TDOT does not allow private irrigation lines under public roads. Please have your L.A. check to see if this will require some changes to the irrigation system.
12/06/2005 TAMI ACHONG ENGINEERING REVIEW Needs Review
12/14/2005 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approv-Cond We have reviewed these plans and have the following comments:

1. Please provide a Streets and Traffic Maintenance signature block on Sheet 1.

No further comments 12/14/05.
12/16/2005 DALE KELCH DOT TRAFFIC REVIEW Denied Traffic Engineering REJECTS this PIA submittal:

1. Paving note 16, sheet 1/7: The title of the referenced manual is "The Manual ON Uniform..." not of.

2. Add a general note to read “All non-signalized intersection street names must have E-W block number addresses for E-W roadways and N-S block number addresses for N-S roadways.”

3. Add R1-1 signs near lots 49, 61.

4. Add R2-1(25) signs near lots 1, 50.

5. Add W14-2 sign near lot 16.

D. Dale Kelch, PE
Senior Engineering Associate
Traffic Engineering Division
(520)791-4259x305
(520)791-5526 (fax)
dale.kelch@tucsonaz.gov
12/19/2005 Blanca Espino DOT ENGINEERING REVIEW Denied SUBJECT: La Cholla Landing, S03-038
PIA Plan T05PI00039

PROJECT REVIEWER: Blanca Espino,Section

PIA Plan
1. Please include a response letter with the next submittal that states how all comments have been addressed. Include plans/redlines from previous plan submittal.

2. See Redlines for detailed information requiring corrections.

3. Sheet 1, A copy of the required "Title Block" is attached. Correct and revise.

4. Sheet 1, Indicate Plan No. I-2005-065 on all sheets.

5. Sheet 1, Delete line; ACCEPTED: C.O.T. Traffic Engineering and date.

6. Sheet 1, Indicate Maps and Plats, Book and Page on cover sheet. Plat must be recorded before submittal of mylars for final review and approval.

7. Sheet 1, Indicate Administrative address on cover sheet.

8. Sheet 1, Add note: The Engineer of Record shall submit to the City for acceptance any changes to the approved plans prior to construction. Additionally, the Engineer of Record shall certify all changes meeting all applicable standards, codes, and ordinances.

9. Sheet 1, Add note to General or Paving Notes: Engineer of Record must provide written documentation that all utilities within the right of way have been cleared for construction.

10. Sheet 1, Add note: The City shall not be held liable for any errors and/or omissions on these plans. Items not meeting City Standards shall be repaired/replaced at no cost to the City.

11. Sheet 1, Add note to General or Paving Notes: All Drainage infrastructures, indicated on the plans, are in accordance to the approved Drainage Report approved by Development Services Department.

12. Sheet 1, Add note: An excavation permit shall be obtained from the City of Tucson Transportation Department prior to any work within the Public right-of-way.

13. Sheet 1, Add note to General or Paving Notes: Floodplain Use Permit No._______, has been issued by Development Services Department for work impacting City and FEMA Floodplains.

14. Sheet 3, Construction Notes # 18; A depressed curb opening is not acceptable. Sidewalk scuppers are required as per D.S. 3-01.4.4.F Correct and revise.

15. Sheet 4, Construction Notes # 16; A depressed curb opening is not acceptable. Sidewalk scuppers are required as per D.S. 3-01.4.4.F Correct and revise.

16. Sheet 5, Depressed Wedge Curb/ Opening Detail is not acceptable. Sidewalk scuppers are required. Correct and revise.

17. Prior to Mylar submittal, Utility Clearance Letters are required to be completed and returned to DSD PIA coordinator.

18. Minimum size and type of storm drainpipe allowed within right of way is 18" R.C.P.