Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T05PI00028
Review Name: PIA SUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/10/2005 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | The following comments, at a minimum, must be addressed in the next submittal: 1. The title block must be revised to the revised DOT Title Block. 2. Provide a cross section view of the proposed pipe outlet along the existing bank protection. 3. Provide station or station equation of proposed culvert outlet relative to existing channel improvement plans (D-87-10). 4. Provide detail on how distrubed bank protection will be repaired. 5. Provide flap gate detail for proposed pipe culvert outlet. 6. Provide filter fabric for proposed rock rip-rap. 7. For section A/1 indicate the portion not in right-of-way as "NOT PART OF P.I.A. 8. For section A/1, existing improvement plan sheets (D-87-10) seems to indicate other items insalled in the drainageway? Please check and note on plan if applicable. 9. The plan indicates a sewer lift station within the retention area. If the lift station fails will flow be diverted into the wash via the proposed stormdrain? |
| 10/10/2005 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | Please address the Native Plant Preservation Ord. within the Alamo Wash area. |
| 10/12/2005 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approv-Cond | We have reviewed these plans and have the following comments: 1) Please provide a Streets and Traffic Maintenance Signature Block. Per our phone conversation with the designers (10/12/05 - 9:05 AM), the storm drain pipe and roadway are already in place. No asphalt patching will be required. 3) Existing structures and roadways should be called out for clarity. No further comments. 10/12/05 |
| 11/04/2005 | DALE KELCH | DOT TRAFFIC | REVIEW | Approved | Traffic Engineering has no comments on this submittal. This appears to be a sewer plan. D. Dale Kelch, PE Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dale.kelch@tucsonaz.gov |
| 11/04/2005 | JBALDER1 | ENGINEERING | REVIEW | Needs Review | |
| 11/07/2005 | JBALDER1 | PIA COORDINATOR | CUSTOMER CALLED | Completed | Angel @ Gregor & Grenier Engineering will be picking up the PIA plans on 11-07-05. |
| 11/07/2005 | JBALDER1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed | Angel @ Gregor & Grenier Engineering will be picking up the PIA plans on 11-07-05. |