Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T05PI00020
Review Name: PIA SUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/02/2005 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
| 09/19/2005 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | I have reviewed these plans and have the following comments: 1) Sheet 1 - Title block indicates that there are 8 sheets in this plan set and there are only 6. 2) Sheets 2-5 - Keynote 1 is missing the word "Easement". 3) Sheet 3 - Keynote 20 - Please verify that note 20 is called out on the plans. 4) Sheet 5 - Keynote 16 - Please verify that note 16 is called out on the plans. 5) Sheet 6 - Street Section - You call for 2' AC over 4" ABC. What AC mix will be used? No further comments this review. (9/19/05_ |
| 09/28/2005 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | September 28, 2005 TO: DSD PIA Coordinator SUBJECT: Desert Stone - Phase 2, Paving Plans S04-064 PROJECT REVIEWER: Richard Leigh, Senior Engineering Associate Permits and Codes Section RESUBMITTAL REQUIRED: PIA and Drainage Report. The Engineering - Permits and Codes Section has reviewed the PIA Plan and Drainage Report and does not recommend approval of the PIA Plan at this time. The Drainage Report is reviewed for PIA purposes. The following review comments need to be addressed in the next submittal. The attached comments are based on the information provided and is not meant as an all inclusive list of items that must be addressed but a check for general conformance to City Standards. The Engineer of Record (The Engineer preparing and certifying the plans, in this case MMLA, Inc.) is responsible for the plans/design meeting all applicable Standards, Codes, Ordinances, and for any issues errors and/or omissions. 1. Check and correct grades, elevations and cross section call out references on plan and profiles views, there appears to be numerous inconsistencies and errors, see redlines. 2. Label limits of warp and superelevated sections in profile views. 3. A minimum 2% roadway cross slope must be provided (DS 3-01.4.5) for all roadways within the subdivision. 4. Provide a pavement section detail. 5. Provide key note call outs for all proposed survey monuments. 6. Sheet 1: Indicate final plat recordation information (Book and Page) on cover sheet. 7. Sheet 1: Remove extra words Lane and Places on "Project Overview", see redlines. 8. Sheet 1: Add plan number (I-2005-057) in title block. 9. Sheet 1: Remove signature line for the "City of Tucson Engineer" 10. Sheet 1: Add general note indicating Asphaltic Concrete requirements. 11. Sheet 1: Remove the word "Asphaltic" from general note 4. 12. Sheet 5: A sidewalk scupper will need to be provides between lots 244 and 245 per DS 3-01.2.8. 13. Provide a complete detail for each type of proposed curb access ramp on the plan set. Additionally, call out Truncated Domes per ADOT Standard Detail C-05.30 sheet 7 of 7 as the detectable warning device. If you have any questions, or if you wish to meet, I can be reached at 791-3115 ext.448 or Richard.Leigh@tucsonaz.gov |
| 09/30/2005 | DALE KELCH | DOT TRAFFIC | REVIEW | Denied | Traffic Engineering REJECTS this PIA submittal: 1. Add a general note to read “All non-signalized intersection street names must have E-W block number addresses for E-W roadways and N-S block number addresses for N-S roadways.” 2. Add the posted speed to Paving note 1. 3. While there is a listing of signs to be installed and locations of the signs on the interior pages, it is not labeled as to which signs are which on the interior sheets. 4. Add a no parking sign detail (attached to redlines). 5. Add "begin" and "end" placards as appropriate to no parking signs. 6. Rotate symbols where no parking areas end 180 degrees (facing oncoming traffic). D. Dale Kelch, PE Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dale.kelch@tucsonaz.gov |
| 09/30/2005 | JBALDER1 | ENGINEERING | REVIEW | Needs Review | |
| 09/30/2005 | JBALDER1 | PIA COORDINATOR | CUSTOMER CALLED | Completed | |
| 09/30/2005 | JBALDER1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed |