Plan Number: T05PI00019
Parcel: Unknown

Address:
9510 E 22ND ST

Review Status: Completed

Review Details: PIA RESUBMITTAL

Plan Number - T05PI00019
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/03/2006 Blanca Espino DOT ENGINEERING REVIEW Denied PIA Plan
1. Please include a response letter with the next submittal that states how all comments have been addressed. Include plans/redlines from previous plan submittal.

2. Once plat is recorded, submit mylars for final review and approval.

3. Comment # 3 is not shown as per your response. Add note to Striping Notes; Signage and striping should be coordinated with Traffic Engineering and installed at no expense to the public. Call Traffic Engineering at 791-4259 prior to the installation or removal of striping and signage.

4. Add assigned Plan Number to all sheets.
01/03/2006 TACHONG1 DOT ENGINEERING UTILITY AWARENESS NOTIFICATION Approved PIA Plan
1. Please include a response letter with the next submittal that states how all comments have been addressed. Include plans/redlines from previous plan submittal.

2. Once plat is recorded, submit mylars for final review and approval.

3. Comment # 3 is not shown as per your response. Add note to Striping Notes; Signage and striping should be coordinated with Traffic Engineering and installed at no expense to the public. Call Traffic Engineering at 791-4259 prior to the installation or removal of striping and signage.

4. Add assigned Plan Number to all sheets.
01/06/2006 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approv-Cond We have reviewed these plans and have the following comments:

1. Please provide a Streets and Traffic Maintennace signature block.

No further commnets. 1/6/06
01/09/2006 TAMI ACHONG PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
01/09/2006 TAMI ACHONG ENGINEERING REVIEW Needs Review
01/09/2006 TAMI ACHONG PIA COORDINATOR OUT TO CUSTOMER Completed
01/09/2006 DALE KELCH DOT TRAFFIC REVIEW Approved
01/09/2006 TACHONG1 CONSTRUCTION ESTIMATE REVIEW Needs Review