Plan Review Detail
Review Status: Completed
Review Details: PIA RESUBMITTAL
Plan Number - T05PI00015
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/09/2006 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approv-Cond | We have reviewed these plans and have the following comments: 1. Sheet 2 of 8 - Note 6 - Note is missing a letter for one of the words. No further comments. 1/9/06 |
01/11/2006 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | January 10, 2006 RESUBMITTAL REQUIRED: Public sewer and paving plans. The Engineering - Permits and Codes Section has reviewed the paving and does not recommend approval of the PIA Plan at this time. The following review comments need to be addressed in the next submittal. 1. Sheet 1: Provide recordation information (Book and Page) on cover sheet. The plat will have to be recorded prior to final approval. 2. Sheet 2: (Detail A/2) Provide all details for the proposed catch basin and junction box at Camino Ensanada del Pantanowas. 3. Sheet 8: Indicate the minimum pavement and aggregate base thickness per a geotechnical report for of the proposed pavement widening on cross sections details C/8 and D/8 Existing pavement section must be matched, if existing pavement section is greater. Do not refer t0o geotechnical report. Additionally, refer to plan number I-2005-070 instead of the activity number. If you have any questions, or if you wish to meet, I can be reached at 791-3115 ext.448 or Richard.Leigh@tucsonaz.gov |
01/11/2006 | RICHARD LEIGH | DOT ENGINEERING | UTILITY AWARENESS NOTIFICATION | Needs Review | January 10, 2006 RESUBMITTAL REQUIRED: Public sewer and paving plans. The Engineering - Permits and Codes Section has reviewed the paving and does not recommend approval of the PIA Plan at this time. The following review comments need to be addressed in the next submittal. 1. Sheet 1: Provide recordation information (Book and Page) on cover sheet. The plat will have to be recorded prior to final approval. 2. Sheet 2: (Detail A/2) Provide all details for the proposed catch basin and junction box at Camino Ensanada del Pantanowas. 3. Sheet 8: Indicate the minimum pavement and aggregate base thickness per a geotechnical report for of the proposed pavement widening on cross sections details C/8 and D/8 Existing pavement section must be matched, if existing pavement section is greater. Do not refer t0o geotechnical report. Additionally, refer to plan number I-2005-070 instead of the activity number. If you have any questions, or if you wish to meet, I can be reached at 791-3115 ext.448 or Richard.Leigh@tucsonaz.gov |
01/13/2006 | TAMI ACHONG | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
01/13/2006 | TAMI ACHONG | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
12/27/2005 | TAMI ACHONG | ENGINEERING | REVIEW | Needs Review | |
12/30/2005 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approv-Cond | The irrigation for T05PI00043 is not approve. See comments under that PIA #. |
12/30/2005 | DALE KELCH | DOT TRAFFIC | REVIEW | Approved |