Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T05PI00013
Parcel: Unknown

Address:
7675 E 22ND ST

Review Status: Completed

Review Details: PIA RESUBMITTAL

Plan Number - T05PI00013
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/22/2005 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved These plans have been reviewed and we have no comments. (9/22/05)
09/28/2005 THAD HARVISON DOT ENGINEERING UTILITY AWARENESS NOTIFICATION Denied SUBJECT: Pantano Overlook, S04-108
PIA Plan T05PI00013

PROJECT REVIEWER: Blanca Espino, Engineering Associate
Permits and Codes Section


RESUBMITTAL REQUIRED: PIA Plan
The Engineering - Permits and Codes Section has reviewed the PIA Plan does not recommend approval of the PIA Plan at this time. The attached comments are based on the information provided and are not meant as an all-inclusive list of items that must be addressed but a check for general conformance to City Standards. The Engineer of Record (the engineer preparing and certifying the plans, in this case Baker & Associates Engineering) is responsible for the plans/design meeting all applicable Standards, Codes, Ordinances, and for any issues errors and/or omissions. The following review comments need to be addressed in the next submittal.

1. Please include a response letter with the next submittal that states how all comments have been addressed. Include plans/redlines from previous plan submittal.

2. Submit a copy of the approved tentative plat.

3. Sheet 9 of 10: Indicate parking in roadway cross section 8.
Response is unacceptable. A DSMR is required from DSD for omission of roadway parking prior to approval. Correct and revise.

4. Sheet 9 of 10: Include parking on both sides of the roadway for cross section 9, DSMR must be obtained for deviation of standards per City Development Standards and Land Use Code.
Response is unacceptable. A DSMR is required from DSD for omission of parking prior to approval. Correct and revise.

5. Sheet 10 of 10: Place paving plan details on a separate sheet (Paving Plan sheet).
Response is unacceptable. Comply with Steve Tineo's comment. Correct and revise.

6. Sheet 10 of 10: 22ND Street Paving Plan detail: Provide corresponding vertical profile for new curbing along 22nd Street.
Response is unacceptable. Comply with Steve Tineo's comment. Correct and revise.

7. Sheet 10 of 10: 22ND Street Paving Plan detail: Per Rezoning condition 32.6. (Per approved Tentative Plat) provide " installation of an additional 12 feet of pavement and the north curb and sidewalk for the entire 22nd St. frontage." Extend paving and taper, and include the corresponding sidewalk and ramp per requirements.
Traffic approval required.


If you have any questions, I can be reached at 791-3115 ext.432 or Blanca.Espino@tucsonaz.gov
09/29/2005 GARY WITTWER DOT LANDSCAPE REVIEW Denied I still need to see your approved NPPO plan. It must include all protected plants within the ROW.
10/06/2005 JBALDER1 ENGINEERING REVIEW Needs Review
10/06/2005 DALE KELCH DOT TRAFFIC REVIEW Approved Traffic Engineering recommends APPROVAL of this PIA.

D. Dale Kelch, PE
Senior Engineering Associate
Traffic Engineering Division
(520)791-4259x305
(520)791-5526 (fax)
dale.kelch@tucsonaz.gov
10/06/2005 JBALDER1 PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
10/06/2005 Blanca Espino DOT ENGINEERING REVIEW Denied SUBJECT: Pantano Overlook, S04-108
PIA Plan T05PI00013

PROJECT REVIEWER: Blanca Espino, Engineering Associate
Permits and Codes Section


RESUBMITTAL REQUIRED: PIA Plan
The Engineering - Permits and Codes Section has reviewed the PIA Plan does not recommend approval of the PIA Plan at this time. The attached comments are based on the information provided and are not meant as an all-inclusive list of items that must be addressed but a check for general conformance to City Standards. The Engineer of Record (the engineer preparing and certifying the plans, in this case Baker & Associates Engineering) is responsible for the plans/design meeting all applicable Standards, Codes, Ordinances, and for any issues errors and/or omissions. The following review comments need to be addressed in the next submittal.

1. Please include a response letter with the next submittal that states how all comments have been addressed. Include plans/redlines from previous plan submittal.

2. Submit a copy of the approved tentative plat.

3. Sheet 9 of 10: Indicate parking in roadway cross section 8.
Response is unacceptable. A DSMR is required from DSD for omission of roadway parking prior to approval. Correct and revise.

4. Sheet 9 of 10: Include parking on both sides of the roadway for cross section 9, DSMR must be obtained for deviation of standards per City Development Standards and Land Use Code.
Response is unacceptable. A DSMR is required from DSD for omission of parking prior to approval. Correct and revise.

5. Sheet 10 of 10: Place paving plan details on a separate sheet (Paving Plan sheet).
Response is unacceptable. Comply with Steve Tineo's comment. Correct and revise.

6. Sheet 10 of 10: 22ND Street Paving Plan detail: Provide corresponding vertical profile for new curbing along 22nd Street.
Response is unacceptable. Comply with Steve Tineo's comment. Correct and revise.

7. Sheet 10 of 10: 22ND Street Paving Plan detail: Per Rezoning condition 32.6. (Per approved Tentative Plat) provide " installation of an additional 12 feet of pavement and the north curb and sidewalk for the entire 22nd St. frontage." Extend paving and taper, and include the corresponding sidewalk and ramp per requirements.
Traffic approval required.


If you have any questions, I can be reached at 791-3115 ext.432 or Blanca.Espino@tucsonaz.gov
10/06/2005 JBALDER1 PIA COORDINATOR OUT TO CUSTOMER Completed