| 07/12/2005 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | Discrepancies from previous submittal have been addressed. Approved as of 7/12/05. |
| 07/18/2005 | DALE KELCH | DOT TRAFFIC | REVIEW | Denied | Traffic Engineering REJECTS this PIA submittal: All comments are from sheet 7/7: 1. The line designation is YDS4-D40/D40, not 4ds4... 2. What are the dashed lines between stations 10+00-10+50, and stations 15+50-16+00 at the southern end of the roadway? Remove these. 3. Make the WG6 lines look like the dashed lines to be removed by comment 2. 4. WG6 lines are to end at BCR not mid radius. (PMDM 3-8) 5. Remove the left arrow at station 15+30. 6. Enclose striped median island at the west end of Fortune Loop. Include YS24 diagonal striping in the gore @80' OC positioned such that there are at least 2 diagonal stripes. See PMDM sheets 4-2 and 4-4 for guidance. 7. Leader to northern most YDS4 striping at the eastern end of the project where the first median area occurs. D. Dale Kelch, PE Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dale.kelch@tucsonaz.gov |
| 07/19/2005 | TAMI ACHONG | ENGINEERING | REVIEW | Needs Review | |
| 07/19/2005 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | July 28, 2005 PIA - Landscape Review by Gary Wittwer T05PI00007 Limberlost Townhomes Notes from May Review -Please submit approved NPPO (Native Plant Preservation Ordinance) plans. The inventory area must include all ROW areas. Not submitted. Planting plan review: 1. Irrigation lines may not be installed inROW (under street) without a Letter of Agreement with the City Engineer. 2. No planting will be allowed along the east side of the west loop. This will block pedestrian access. |
| 07/29/2005 | THAD HARVISON | CONSTRUCTION ESTIMATE | REVIEW | Denied | The attached comments are based on the information provided and is not meant as an all inclusive list of items that must be addressed but a check for general conformance to City Standards. The Engineer of Record (The Engineer preparing and certifying the plans, in this case Arcadis) is responsible for the plans/design meeting all applicable Standards, Codes, Ordinances, and for any issues errors and/or omissions. 1. Sheet 1: Provide the recordation Book and Page. 2. Sheet 1: Remove the signature lines under "accepted By:", the title block already includes these signatures. 3. Sheet 2 : The sidewalk must be continued along the north side of Fortune Loop and adjacent to the "EXCLUDED PARCEL", previous comment. 4. Sheet 2: the cross section call outs (A/3 and B/3) are not located as indicated? revise. 5. Sheet 2: A portion of the ramp located at the north-east corner of Fortune Loop and Limberlost Drive are not within the r/w. revise. 6. Sheet 2: Will the roadway drain into scupper 1? Will the roadway prism transition from a normal to a warped section to direct roadway runoff into scupper1? Revise plans accordingly (Check roadway drainage before resubmittal). 7. Sheet 3: The plan view of Limberlost Dr does not match the proposed improvements (roadway widening on the north side). revise. 8. Sheet 4: Provide recodation information Book and page for r/w dedications. 9. Sheet 4: The plans indicate "PIPE TO REMAIN" but according to other sheets the pipe is to be removed and replaced? revise. 10. Sheet 4: Provide horizontal location (Station and offsett) of proposed drainage structures (TYPICAL). 11. Sheet 5: Provide pavement section per approved geotech report for the subject project. 12. Sheet 5: Detail F, provide a 2' minimum setback between the channel top hinge point and PL per City Grading Ordinance. Revise. 13. Sheet 6: Scupper 1 and 2 details, how many scuppers? Call out number of scuppers, revise. 14. Sheet 6: Provide profile for Scupper 2, the detail shown (Scupper b/b) is not applicable to Scupper 2 (scupper 2 drains into the roadway). Revise. 15. Sheet 6: Detail J: The proposed grates must not project into the roadway, the scuppers must be arranged parallel to the roadway as per City Details, revise. 16. Sheet 7: Provide curb access ramp details on another sheet not on the striping sheet. 17. Sheet 7: The curb access ramps are based on 7" curbing. Included in the redlines are the ramp details to be used and included on these plans. 18. Per Federal ADA requirements all access ramps must include truncated domes. |
| 08/01/2005 | TAMI ACHONG | PIA COORDINATOR | CUSTOMER CALLED | Completed | |
| 08/01/2005 | TAMI ACHONG | PIA COORDINATOR | OUT TO CUSTOMER | Completed |