Review Date Reviewer's Name Type of Review Description Status Comments
05/13/2005 GARY WITTWER DOT LANDSCAPE REVIEW Denied May 12, 2005

PIA – Landscape Review by Gary Wittwer
T05PI00007

Limberlost Townhomes

Please submit approved NPPO (Native Plant Preservation Ordinance) plans. The inventory area must include all ROW areas.
05/17/2005 THAD HARVISON DOT ENGINEERING REVIEW Denied I have reviewed the subject project and have the following comments:

1. According to the Drainage report the proposed scuppers (located along Limberlost) were sized based on the 10-year flow, however the scuppers were not checked for 100-year flow conveyance? Do the proposed scuppers (SC2) convey the 100-year flow in accordance to COT Drainage Standards?

2. Sheet 1 of 7: Please add notes as shown on redlines, and change title blocks as indicated on plan sheet.

3. Sheet 1 of 7: Will sewer be included on these plans?

4. Sheet 2 of 7: Please add access ramp at the NE corner of Fortune Loop and Limberlost.

5. Sheet 2 of 7: Please continue sidewalk and curbing along the "excluded parcel" located at the NE corner of Fortune Loop and Limberlost.

6. Sheet 2 of 7: Key note 2, please specify the detail and page for the proposed handicap ramps. Please provide ramp detail on this plan set.

7. Sheet 3 of 7: Key note 2, please specify the detail and page for the proposed handicap ramps. Please provide ramp detail on this plan set (Typical)

8. Sheet 4 of 7: Provide pavement edge transition and thickened edge section as included and red-lined on this sheet.

9. Sheet 4 of 7: the " 2' TO BE DEDICATED BY SEPARATE INSTRUMENT" is not acceptable. All right-way must be dedicated prior to plan approval (typical).

10. Sheet 5 of 7: Cross slope for new pavement sections (Details C and F) must be 2%.

11. Sheet 5 of 7: Please indicate those areas not in right-of-way as "Not Part of PIA" (typical).

12. Sheet 6 of 7: Revise the proposed Neenah grate to a standard (bicycle safe) COT standard catch basin -grate such as Catch Basin Type I, detail 307.

13. Sheet 6 of 7: Can the number of scupper cells (18 cells at 4') be reduced by providing a area catch basin in the common area and pipe some of the flow into the existing storm drain located across from the scuppers?

14. Sheet 6 of 7: Do the proposed scuppers convey the 100-year event in accordance to the City drainage standards (see comment 1 above)?
06/07/2005 DALE KELCH DOT TRAFFIC REVIEW Denied Traffic Engineering REJECTS this PIA submittal:


1. General note 12, sheet 1: The title is "The Manual ON Uniform Traffic Control Devices" not the Manual of...

2. Add a general note 23 to read “All non-signalized intersection street names must have E-W block number addresses for E-W roadways and N-S block number addresses for N-S roadways.”

3. Show new R1-1 signs at both intersections of Fortune Loop and Limberlost Drive (sheets 2, 3, 4, 7)

4. See additional redline comments sheet 7.


D. Dale Kelch, PE
Senior Engineering Associate
Traffic Engineering Division
(520)791-4259x305
(520)791-5526 (fax)
dale.kelch@tucsonaz.gov
06/09/2005 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied I have reviewed these plans and have the following comments:

1. Sheet 1 - Need a Streets and Traffic Maintenance Signature Block.
2. Sheet 5 of 7 - Limberlost Cross Section - Screen Wall is shown but no detail or information is given. Is this an existing wall?
3. Sheet 6 of 7 0 Detail J - Grate Inlet Plan - Please verify the plans call for "Havy Duty Grates".

No Additional Comments
06/09/2005 TAMI ACHONG PIA COORDINATOR CUSTOMER CALLED Completed
06/09/2005 TAMI ACHONG ENGINEERING REVIEW Needs Review
06/09/2005 TAMI ACHONG PIA COORDINATOR OUT TO CUSTOMER Completed