Review Date Reviewer's Name Type of Review Description Status Comments
02/20/2008 SMONTIE1 UTILITY CLEARANCES COT STREETS DIVISION Completed
02/20/2008 SMONTIE1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
02/20/2008 SMONTIE1 UTILITY CLEARANCES PC WASTEWATER MGMT Completed
02/20/2008 SMONTIE1 UTILITY CLEARANCES QUEST COMMUNICATION Completed
02/20/2008 SMONTIE1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
02/20/2008 SMONTIE1 UTILITY CLEARANCES COX COMMUNICATION Completed
02/20/2008 SMONTIE1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
02/20/2008 SMONTIE1 UTILITY CLEARANCES EL PASO NATURAL GAS Completed
02/20/2008 SMONTIE1 UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
02/29/2008 RICHARD LEIGH DOT ENGINEERING REVIEW Denied 3rd Submittal Review Comments from City of Tucson PIA:
Plan Review Comments - T05PI00005

Comments by various reviewers listed, received as a combined list of comments:



COMMENTS BY RICHARD LEIGH

1. The transportation signature line has been removed from the title block. See revised sheet 1.

2. The placement of filter fabric has been indicated on all dumped rip-rap locations. See revised sheets 3, 4, 8, and 9. Sheet 3 references filter fabric in a note just below the "elevation table" in Detail D.


3. Dimensions have been provided for the rip-rap blankets at the cross-drainage culverts. See revised sheets 8 and 9.

4. The limits of the curb and sidewalk were discussed and agreed to by the city back during the first submittal of this PIA. The limits of the northern end of the project were dictated by drainage. Providing "ultimate" curb and sidewalk to the project limit on the north would not have allowed the interim drainage scheme to work. Constructing curb the entire length of the project would require drainage openings (scuppers) between the last culvert on the north and the RR tracks. The invert of the openings would not contain the WSEL required for the development in the temporary condition, and storm water could backflow through the storm drain (scuppers) on to Wilmot Road. By not constructing the curb on the north end, the resulting hinge point of the embankment can be used to contain the WSEL until a future project can extend Wilmot Road. The profile grades of the future project will rise to the elevation of the RR tracks, which will allow for construction of curb and storm drain in that area while containing headwater, and preventing backflow on to Wilmot Road. Wilmot Road really can't be totally completed to full width for the length of the development on the north end until the City commits to extending improvements on Wilmot Road north of the RR tracks. These issues are discussed in length in the Wilmot Road Drainage Report. The south end of the project was limited by right of way issues and its spatial relationship to the I-10 frontage road intersection. Providing "ultimate" curb and sidewalk to the limits of the southern boundary of the project resulted in a lack of right of way to taper back down to existing. Also tapering back to existing any further south then what we show on the plans had negative affects to the I-10 intersection.




February 29, 2008

SUBJECT: La Estancia -Offsite, Wilmot Road, PIA Plan T05PI0005, I-2007-053

PROJECT REVIEWER: Richard Leigh

RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal.

1. Remove the signature line for Transportation Planning in the title block. See attached.

2. Indicate the placement of filter fabric on all dumped rip rap energy dissipaters/scour protection locations.

3. Provide dimensions for the dumped rip rap blankets at the culvert inlets at Sta. 20+00 and 54+00 (Wilmot Road).

4. Why is curb and sidewalk not being provided along the entire frontage of the subdivision per Development Standard 3-01.3.3?

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsoz.gov
03/12/2008 JOSE ORTIZ DOT TRAFFIC REVIEW Denied March 12, 2008
ACTIVITY NUMBER: T05PI00005
PROJECT NAME: La Estancia
PROJECT ADDRESS: Wilmot Rd/Los Reales
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal.

The following items must be revised or added to the plan.

1. Include a response letter with the next submittal that states how all comments have been addressed.

2. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes.
03/14/2008 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied We are in the process of reviewing this plan and have the folowing comments:

Landscaping:

1. The irrigation controller should be ET2000E with remote.
2. Please call out brass ball valves for the mainlines instead of plastic.
3. Emitter loops inside pit boxes. Please see sheet 9 of the landscape plan.
4. Please provide insulation on all backflows.

Our Electric Shop is currently reviewing this plan. I will be out of the office and will not receive their comments until my return on March 21. You may contact Ray Quihuis at 791-3154 for comments if you need them prior to the 21st.
03/26/2008 SMONTIE1 PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
03/26/2008 GARY WITTWER DOT LANDSCAPE REVIEW Denied See streets irrigation notes.
03/26/2008 SMONTIE1 PIA COORDINATOR OUT TO CUSTOMER Completed