Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T05PI00002
Parcel: Unknown

Review Status: Completed

Review Details: PIA RESUBMITTAL

Plan Number - T05PI00002
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/31/2006 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approv-Cond We have reviewed these plans and have the following comments:

Landscape:

1. Main line filter and flush valve filter need schedule 80 unions.
2. Need senninger preset regulators.

No further comments 3/31/06
04/03/2006 Estevan Tineo DOT ENGINEERING REVIEW Denied 4/3/2006 - Menlo Park Mercado District (T05PI00002)

Please note the following comments (at a minimum) that must be addressed in the next submittal:


1. Previous comment 8 not addressed "Sheet 2 of 8: Provide vertical curves for longitudinal changes in grade greater than 1%." This comment must be addressed. The proposed horizontal and vertical alingment must follow the ASSHTO Green Book design guidelines, revise accordingly.

2. Previous comment 6 not addressed "General comment: Detail on plans each type of ramps to be used, include truncated domes per Federal Standards." Detail each type of ramp on plans.
04/07/2006 TAMI HAUSER ENGINEERING REVIEW Needs Review
04/07/2006 TAMI HAUSER UTILITY CLEARANCES COT STREETS DIVISION Completed
04/07/2006 TAMI HAUSER UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
04/07/2006 TAMI HAUSER UTILITY CLEARANCES PC WASTEWATER MGMT Completed
04/07/2006 TAMI HAUSER UTILITY CLEARANCES QUEST COMMUNICATION Completed
04/07/2006 TAMI HAUSER UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
04/07/2006 TAMI HAUSER UTILITY CLEARANCES COX COMMUNICATION Completed
04/07/2006 TAMI HAUSER UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
04/07/2006 TAMI HAUSER UTILITY CLEARANCES EL PASO NATURAL GAS Completed
04/07/2006 TAMI HAUSER UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
04/13/2006 TAMI HAUSER PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
04/13/2006 DALE KELCH DOT TRAFFIC REVIEW Denied Traffic Engineering REJECTS this PIA submittal:

1. Sheet 3/8: At the SWC of Avenida Convento/Congress is a sign facing eastbound traffic on Congress that is called out as keynote 26. I believe this should be keynote 27.

2. Sheet 3/8: there are several keynote 22 callouts on this sheet with no keynote 22 identified in the legend.

Striping plan:

1. General note 4: The title of the referenced manual is "The Manual ON Uniform..." not of.

2. Sheet 2/2: Identify the R1-1 and R3-5(R) signs.

D. Dale Kelch, PE
Senior Engineering Associate
Traffic Engineering Division
(520)791-4259x305
(520)791-5526 (fax)
dale.kelch@tucsonaz.gov
04/13/2006 TAMI HAUSER PIA COORDINATOR OUT TO CUSTOMER Completed
04/13/2006 THAUSER1 CONSTRUCTION ESTIMATE REVIEW Needs Review