Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA RESUBMITTAL
Plan Number - T05PI00001
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/03/2006 | Estevan Tineo | DOT ENGINEERING | REVIEW | Denied | Permits and Codes has reviewed the subject plan (T0PI00001) and has provided the following comments. The following comments, at a minimum, must be addressed in the next submittal. 1. Sheet 1 of 18: Provide recordation information (Book and Page) on conver sheet. 2. Sheet 1 of 18: Please include the notes as provided on cover sheet. 3. Sheet 2 of 18: Detail all type of ramps to be used in project. Include truncated domes for each ramp per ADA requirements (This is a Typical comment). 4. Sheet 2 of 18: Note 6, please call out curb reveal (This is a Typical comment). 5. Sheet 2 of 18: Post barricades in pavement section? Revise accordingly. 6. Sheet 2 of 18: Provide scupper at proposed depressed curb opening at Sta 14+15.00, 15' LT. (Typical comment revise others accordingly). 7. Sheet 3 of 18: Place this note for work outside of right-of-way "NOT PART OF P.I.A." (Typical comment). 8. General comment: All work not in public right-of-way (private alleys) must be constructed under a grading plan / permit per the City Grading Ordinance, revise plans accordingly. 9. Sheet 4 of 18: Provide vertical curve for changes in grade greater than 1% (typical comment), for example provide vertical curve between station 5+33.04 and 5+39.04. 10. Sheet 5 of 18: Check horizontal alignment (change in horizontal curvature, or in this case the lack thereof) in accordance to AASHTO Green Book guidelines for geometric design (Typical comment). 11. Sheet 5 of 18: The proposed post barricades must not be placed within the sidewalk area (Station 13+50 t0 14+50 +/-). 12. Sheet 6 of 18: Post barricades in pavement section and within sidewalk areas? Revise. 13. Sheet 7 of 18: Plan calls out details 10/18 and 11/1, but sheet 18 does not include these details? Revise accordingly. 14. Sheet 7 of 18: Add the following note "NOT PART P.I.A." for alley work (Typical comment). 15. Sheet 8 of 18: See comment 14. 16. Sheet 9 of 18: See comment 14. 17. Sheet 10 of 18: See comment 14. 18. Sheet 11 of 18: The work along Congress should be all offsite. 19. Sheet 11 of 18: Call out ramps. 20. Sheet 11 of 18: Call out curb reveal. 21. Sheet 11 of 18: Detail special pavement on plans. 22. Sheet 12 of 18: Detail 7, move right-of-way line to face of curb. 23. Sheet 12 of 18: For Details 7, 9, 10, and 12 provide this note for those portions in the right-of-way "NOT PART OF P.I.A.". 24. Sheet 14 of 18: Proposed Aprons 1,2, and 3 dimensions length and width of ramps, include expansion joint locations, and other pertinent information per City ramp details. 25. Sheet 15 of 18: Provide a minimum of 2' spacing between storm drains. |
01/09/2006 | TAMI ACHONG | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
01/09/2006 | DALE KELCH | DOT TRAFFIC | REVIEW | Denied | Traffic Engineering REJECTS this PIA submittal: 1. Add the keynote 27 to call out the indicated R1-1 at the intersection of Congress/Avenida del Sembrador on sheets 2, 11 2. Keynote 2 directs me to see striping plans for details. There are no striping plans. Is this striping plan a distinct and separate plan set? If so, make the note clearly state so. 3. Revise bollard placement at intersections to as was discussed on 15DEC2005. D. Dale Kelch, PE Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dale.kelch@tucsonaz.gov |
01/09/2006 | TAMI ACHONG | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
01/09/2006 | TACHONG1 | DOT ENGINEERING | UTILITY AWARENESS NOTIFICATION | Completed | Permits and Codes has reviewed the subject plan (T0PI00001) and has provided the following comments. The following comments, at a minimum, must be addressed in the next submittal. 1. Sheet 1 of 18: Provide recordation information (Book and Page) on conver sheet. 2. Sheet 1 of 18: Please include the notes as provided on cover sheet. 3. Sheet 2 of 18: Detail all type of ramps to be used in project. Include truncated domes for each ramp per ADA requirements (This is a Typical comment). 4. Sheet 2 of 18: Note 6, please call out curb reveal (This is a Typical comment). 5. Sheet 2 of 18: Post barricades in pavement section? Revise accordingly. 6. Sheet 2 of 18: Provide scupper at proposed depressed curb opening at Sta 14+15.00, 15' LT. (Typical comment revise others accordingly). 7. Sheet 3 of 18: Place this note for work outside of right-of-way "NOT PART OF P.I.A." (Typical comment). 8. General comment: All work not in public right-of-way (private alleys) must be constructed under a grading plan / permit per the City Grading Ordinance, revise plans accordingly. 9. Sheet 4 of 18: Provide vertical curve for changes in grade greater than 1% (typical comment), for example provide vertical curve between station 5+33.04 and 5+39.04. 10. Sheet 5 of 18: Check horizontal alignment (change in horizontal curvature, or in this case the lack thereof) in accordance to AASHTO Green Book guidelines for geometric design (Typical comment). 11. Sheet 5 of 18: The proposed post barricades must not be placed within the sidewalk area (Station 13+50 t0 14+50 +/-). 12. Sheet 6 of 18: Post barricades in pavement section and within sidewalk areas? Revise. 13. Sheet 7 of 18: Plan calls out details 10/18 and 11/1, but sheet 18 does not include these details? Revise accordingly. 14. Sheet 7 of 18: Add the following note "NOT PART P.I.A." for alley work (Typical comment). 15. Sheet 8 of 18: See comment 14. 16. Sheet 9 of 18: See comment 14. 17. Sheet 10 of 18: See comment 14. 18. Sheet 11 of 18: The work along Congress should be all offsite. 19. Sheet 11 of 18: Call out ramps. 20. Sheet 11 of 18: Call out curb reveal. 21. Sheet 11 of 18: Detail special pavement on plans. 22. Sheet 12 of 18: Detail 7, move right-of-way line to face of curb. 23. Sheet 12 of 18: For Details 7, 9, 10, and 12 provide this note for those portions in the right-of-way "NOT PART OF P.I.A.". 24. Sheet 14 of 18: Proposed Aprons 1,2, and 3 dimensions length and width of ramps, include expansion joint locations, and other pertinent information per City ramp details. 25. Sheet 15 of 18: Provide a minimum of 2' spacing between storm drains. |
12/15/2005 | TAMI ACHONG | ENGINEERING | REVIEW | Needs Review | |
12/28/2005 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approv-Cond | 1. Sheet 9 of 15 needs to be resubmitted. The irrigation layer were turned off. (no irrigation shown) 2. Irrigation plans are difficult to read. Please turn off the planting and hardscape layers for final mylar submital. 3. We need to see the documentation of easements for private irrigation lines in ROW. |