Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE
Permit Number - T05OT01110
Review Name: RESUBMITTAL - SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/22/2005 | CRAIG GROSS | ZONING | REVIEW | Approved | |
| 09/22/2005 | CRAIG GROSS | NPPO | REVIEW | Approved | NPPO exception approved |
| 09/22/2005 | CRAIG GROSS | LANDSCAPE | REVIEW | Approved | |
| 10/21/2005 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | DATE: October 24, 2005 TO:Dinkar Gangwal, Alpha Engineering SUBJECT: Equipment Storage Facility REVIEWER: Loren Makus ACTIVITY NUMBER: TO5OT01110/T05BU01065 SUMMARY: The Grading Plan and Stormwater Pollution Prevention Plan were reviewed by Development Services Department Engineering Division. The Grading Plan and Stormwater Pollution Prevention Plan (SWPPP) were not approved at this time. Drainage/Hydrology Report comments: The drainage report indicates that the detention requirements for this project will be accommodated with an off-site drainage solution. Provide the following in order for the project to be approved. 1. Provide a notarized letter from the owner of the adjacent property granting permission for use of the off-site drainage solution. 2. Provide contours or sufficient spot elevations on the adjacent properties to establish that the proposed drainage scheme is achievable. 3. Provide a drainage and maintenance access easement from the adjacent property. Include recordation information on the plan. 4. Provide details and dimensions of the existing detention basin. Site/Grading Plan comments: 5. The site plan must be approved before the grading permit can be approved. Additional Comments may be forthcoming after the site plan has been approved. 6. Provide contours or sufficient spot elevations on the adjacent properties to establish that the proposed drainage scheme is achievable. 7. Provide a drainage and maintenance access easement from the adjacent property. Include recordation information on the plan. Revise the Grading Plan and Drainage Report in accordance with these comments. Loren Makus, E.I.T. Senior Engineering Associate Engineering Division |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/24/2005 | KMEDINA1 | OUT TO CUSTOMER | Completed |