Review Status: Completed
Review Details: RESUBMITTAL - SITE ALL
Permit Number - T05OT00948
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/16/2005 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | SITE PLAN TRANSMITTAL TO: EEC 4625 E. Ft. Lowell Rd. Tucson, AZ 85712 FROM: Peter McLaughlin Senior Planner FOR: Patricia Gehlen Principal Planner PROJECT: T05OT00984 UMC Cancer Center 3838 N. Campbell Avenue TRANSMITTAL: June 16, 2005 COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. Prior to site plan approval, provide lot combination documents including Assessor's lot combo docs and notarized/recorded covenant. These documents are available at the City of Tucson Zoning Review counter. 2. The handicap parking calculation indicates 12 h/c spaces are provided but 18 are shown on the drawing. Revise for consistency. 3. Provide the angle and the dimensions of the existing angled parking, including PAAL widths in the parking lot located to the south of Allen Road. DS 2-02.2.1.A.8 If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608. |
06/16/2005 | PETER MCLAUGHLIN | ZONING HC SITE | REVIEW | Denied | See zoning review comments. |
06/21/2005 | JOSE ORTIZ | ENGINEERING | REVIEW | Denied | To:Client Joe Zeman DATE: June 21, 2005 Title EEC Contact FROM: Jose Ortiz, PE 4625 E. Ft Lowell Rd Tucson, Arizona 85712 SUBJECT:Site plan T05OT00948 (Second Review) T13S, R14E, Section 29 RESUBMITTAL REQUIRED: Site Plan and Hydrology Report. The Site Plan (SP) and Drainage Statement cannot be approved as submitted. Please address the following review comments prior to the next submittal, and provide a detail response letter stating how each comment was address to assist in the follow up review process. Site Plan: 1. Please include a response letter to the comments along with the corrected copies of the SP. 2. Identify location and width of all utility easement. Some of the utility easement keynotes are not shown in the plan view. . Refer to Engineering redlines for clarification. 3. Some confusion with the cross-referencing of some details on the detail sheets. Refer to Engineering redlines for clarification. 4. Due to new city policies all arterial and collector roads shall require 6' sidewalks, per Major Streets and Routes (MS&R) Plan Campbell Avenue is an arterial road and will require 6' sidewalks. 5. The previous comment "Add the basin(s) maintenance responsibility note per S.M.D.D.F.M. 2.3.1.6 C 1 and 2 to the SP. " may still be needed do to comments made during the grading plan review. See Drainage comments below for clarification. Drainage Statement: 1. Please include a response letter to the comments along with the corrected copies of the Drainage Statement 2. The following is a comment made during the grading plan review (T05BU01167) of the Drainage statement. "In the Drainage Statement it is stated that the existing impervious condition will be lowered from 66% to 57% impervious cover, which will eliminate the need for a retention basin based on the fact that water flow volume will be lowered due to this condition. Please verify that there are no existing drainage flow issues that can be eliminated with the use of a retention/detention basin. Second, please indicate in the drainage statement how much the landscaping water harvesting basins can retain, and whether they can handle any existing drainage issues. " For additional clarification of the review comments refer to the redlines on the 4 sheets provided during our review. If you have any questions, please feel free to contact me at 791-5550 x1191 or Jose.Ortiz@tucsonaz.gov Jose E. Ortiz Civil Engineer City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 791-5550 x1191 office (520) 879-8010 fax C:/0000 O. Street Address_Site |
06/22/2005 | ANDREW CONNOR | LANDSCAPE | REVIEW | Denied | 1. Submit approved site and landscape plans for Parcel 2 parking lot along Allen Rd. identified on Sheet 1 of 3 and 2 of 3 of the Site plan. 2. A 5' wall to screen office zoned property to the north from vehicle use area is required per LUC 3.7.2-I. Show the location of wall on landscape, site and grading plans. All walls required by this Division must be of masonry material or masonry with a stucco or textured finish. 3. A 5' continuous screen along Allen Rd. for vehicle use area is required per LUC Table 3.7.2-I. Hedges and other vegetative screens shall not extend more than three (3) feet into the street landscape border. Identify on landscape plan screen along Allen Rd. |
06/22/2005 | ANDREW CONNOR | NPPO | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/28/2005 | GBONILL1 | OUT TO CUSTOMER | Completed |
06/28/2005 | SUE REEVES | REJECT SHELF | Completed |