Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T05OT00516
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/17/2005 | DOUG WILLIAMS | ENGINEERING | REVIEW | Denied | SUBJECT: Drainage Statement/Floodplain Use Permit review DATE: 17 June 2005 ACTIVITY NUMBERS: T05CM01015/T05OT00516 T14S, R13E, Section 3 Engineering Division has reviewed the Subject items, and approval is not recommended at this time. Please provide a Hydrology Report addressing the comments provided below at a minimum, and include a response letter addressing all comments. Drainage Statement/Floodplain Use Permit comments: Refer to Development Standard (DS) 10-02.0 (City of Tucson's Standards Manual for Drainage Design and Floodplain Management), Section 2.3, 5.2 and Tucson Code, Sections 26-5.2 and 26-11-Floodway Fringe and Floodplain permitting requirements, respectively. 1. Include the name, address and telephone number of the project owner and client for whom the report was prepared, if different (DS 10-02.0, Sec. 2.3.1.1 B, C). 2. Provide a table of contents - numbered sequentially, with reference to any appendices (DS 10-02.0, Sec. 2.3.1.1 G 3. The report must address the size, location and hydrologic characteristics of the upstream watershed which affects the site, in accordance with DS 10-02.0, Section 2.3.1.3 A 2). 4. Specify elevation data in the report exhibit for flood depths and the proposed structure's floor elevation to be in accordance with Federal Emergency Management (FEMA) floodplain development requirements. Elevation data must be in accordance with National Geodetic Vertical Datum (NGVD) 1929 for FEMA floodplain development and permitting requirements. Provide North American Vertical Datum (NAVD) 1988 - or a conversion for such from NGVD 29 - as will be necessary for site/grading plan approval. The site plan must include a local benchmark elevation with reference to City datum (NAVD 1988), and reference City Field Book and Page or GPS control point - this information may be available at: http://tdotmaps.transview.org/mapguide_mwf_tdot.htm (DS 2-02.2.1 A 23). 5. Depict 100-year floodplain limits and areas of sheet flooding resulting from 100-year flood peaks of 100-cfs or greater on a site plan contained within the report (El Rio Wash - a federally mapped floodplain). Include spot- or water surface elevations, ground contours, and clearly label the regulatory floodplain as such on the site, grading or drainage plan (DS 10-02 - Sections 2.3.1.4 C 1- 6 & Sec. 5.2.1, 5.2.4 & 5.2.5). 6. Provide an encroachment analysis demonstrating no adverse impact will occur to adjacent properties - upstream or downstream or in the public right of way, and that there will not be an increase in the Base Flood Elevation by more than .1' (Tucson Code, Section 26-.5.2). 7. The report must provide erosion protection, and lowest floor elevation recommendations based upon El Rio Wash 100-year flooding depths and velocities (Tucson Code, Sec. 26-5.2 SITE PLAN: 1. Depict 100-year floodplain limits and water surface elevations onsite (DS 2-02.2.1 A 15). 2. Depict drainage patterns, proposed finish floor elevation and finish grades (DS2-02.2.1 A 16) 3. Provide estimated cut and fill quantities DS 2-02.2.1 A 17). 4. Depict existing topographic contours and provide a benchmark based on City of Tucson Datum, including city field book and page number (DS 2-02.2.1 A 23). Resubmittal will require a complete hydrology report and a revised site plan addressing all items listed above. Subsequent comments may be necessary upon resubmittal depending on the nature and extent of revisions that occur to the report and/or exhibits. If you have any questions, I can be reached at 791-5550, extension 1189 or Doug.williams@tucsonaz.gov Douglas Williams Sr. Engineering Associate Engineering Division Development Services Department |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/26/2005 | GBONILL1 | OUT TO CUSTOMER | Completed |
| 07/26/2005 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |