Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T05OT00311
Parcel: Unknown

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T05OT00311
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/05/2005 MATT FLICK ENGINEERING REVIEW Denied DSD Engineering Comments for T05OT00311


1. (Advisory comment) Thank you for adding the acknowledgement regarding the use of data/results from other drainage submittals. As you know, a standard comment on our response letters goes something like "the drainage report was reviewed for ____________ purposes only". Thus, it's up to the consultant to ensure that the data/results are applicable to the current project.

2. (Advisory comment) Thank you for the acknowledgement that offsite property (and easement?) owner permission will be needed for construction of the offsite channel.

3. (Advisory comment) Depending on the timing of the project, the owner may wish to initiate discussions with the City to determine if the proposed channel provides a public benefit for which the City of Tucson would assume maintenance of the channel.

4. Based upon the provided topography, I do not see anything that prevents the outflanking of the low berm discussed in the first paragraph on Page 5. Thus, it would appear that RS 9-11 in the existing conditions analysis should not be analyzed assume no flow below the level of the top of berm. This has ramifications for comparison of the existing conditions and proposed conditions analyses for conformance to the City's floodplain ordinance.

Please address Comment #4. If you wish to contact me to discuss these comments, please call me at 791-5550, ext. 1192 or e-mail me at matthew.flick@tucsonaz.gov.

Matt Flick, PE
Engineering Manager
5MAY05