Review Status: Completed
Review Details: RESUBMITTAL - SITE ALL
Permit Number - T05OT00211
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/28/2005 | JIM EGAN | FIRE | REVIEW | Denied | 1. Fire hydrants required. Submit approved COT Water Plan. 2. A minimum 20 feet wide, paved, fire appratus access roadway must be provided and extended to with 150 feet of the exterior walls of all structures. An approved turnaround is required for dead-end access roadways. |
| 07/29/2005 | PAUL MACHADO | ENGINEERING | REVIEW | Denied | To: Benjamin Cole DATE: August 4, 2005 Architect 7065 N. Oracle Rd. Tucson, Arizona 85704 SUBJECT: 8526 E Tanque Verde Rd., Bandelero Ranch Site plan T05CM00211 (Third Review) Floodplain Use Permit T05OT00218 (3rd Review) T13S, R15E, Section 33 RESUBMITTAL REQUIRED: Flood Plain Use Permit, Site plan, Grading plan, and W.A.S.H. mitigation plan. NOTE: ALL COMMENTS ARE FROM THE PREVIOUS SUBMITTAL. REVISE AND RE-SUBMIT AS REQUIRED. Site Plan: 1. The Site Plan, Grading plan and W.A.S.H. mitigation plan must be approved by the pertaining DSD departments prior to the issuance of the FUP. Comment No. 2 must also be satisfied by Landscaping and Zoning. 2. An Overlay Zone Application for a W.A.S.H. review will be required and must be included with the re-submittal. Inquire with the zoning dept. for applicability and procedure. 3. No record was found indicating the submittal of the W.A.S.H. mitigation plan. 4. A Grading permit and Stormwater Pollution Prevention Plans (SWPPP) will be required for this project. The SWPPP review is done concurrently with the Grading plan. Please resubmit the SWPPP along with the Grading review. Floodplain Use Permit: 1. The FUP cannot be approved prior to the grading plan, site plan W.A.S.H. Mitigation plan. Re-submit along with the grading plan. Drainage Report: 1. The DR has been accepted for site plan purposes only. The final acceptance will be done at the grading plan stage. Stormwater pollution prevention plan: 1. The SWPPP review is done concurrently with the Grading plan. Please resubmit the SWPPP along with the Grading review. The SWPPP will be reviewed at time. If you have any questions, I can be reached at 791-5550 x1193 or Paul.Machado@tucsonaz.gov Paul P. Machado Senior Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 791-5550 x1193 office (520) 879-8010 fax C:/ 8526 E Tanque Verde Rd._Site 3 |
| 08/04/2005 | ANDREW CONNOR | NPPO | REVIEW | Denied | 1. Applications filed under SCZ Overlay procedure require review and decision by the development services department (DSD) director or designee certifying the implementation of all applicable LUC requirements of the SCZ zone. Approval is necessary to continue review. 2. Plans for the proposed wash treatment and a preservation/re-vegetation must be submitted to DSD and approved as provided for in section TCC Sec 29-1. The landscape division as of 8/4/05 has not received the application for review. |
| 08/04/2005 | DAN CASTRO | ZONING | REVIEW | Denied | COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. Site plan may not be approved prior to SCZ approval. SCZ plan is under review. Assure that all applicable information related to the W.A.S.H. overlay zone review is added to the site plan. If you have any questions about this transmittal, please call Dan Castro, (520) 791-5608 ext. 1180. An appointment is required to discuss these comments in person. |
| 08/04/2005 | ANDREW CONNOR | LANDSCAPE | REVIEW | Denied | 1. Applications filed under SCZ Overlay procedure require review and decision by the development services department (DSD) director or designee certifying the implementation of all applicable LUC requirements of the SCZ zone. Approval is necessary to continue review. 2. Plans for the proposed wash treatment and a preservation/re-vegetation must be submitted to DSD and approved as provided for in section TCC Sec 29-1. The landscape division as of 8/4/05 has not received the application for review. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/12/2005 | JMORALE1 | OUT TO CUSTOMER | Completed |
| 08/12/2005 | SUE REEVES | REJECT SHELF | Completed |