Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T05CM06363
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/04/2006 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | City of Tucson, Development Services BUILDING AND STRUCTURAL COMMENTS 1/03/06 1) a. Clarify code check, it shows fire sprinklers are required and provided, while the Building Code review does not specify sprinklers. b. Also, under code check the area shown is 3750 sq. ft. But under the Building Code review it shows 6327 sq. ft. 2) Specify the occupant load under the building code review. 3) Plumbing Code used is the 2003 UPC w/ amendments. 4) See table 704.8 for max. area of exterior wall openings (north and south walls). |
| 01/04/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The applicable code for all commercial plumbing projects is the 2003 Uniform Plumbing Code with Local Amendments. 2. Verify that the existing private sewage collection system has cleanouts located per Section 719.1, UPC 2003. 3. Clarify the location of keynote #6 on sheet A-3 and coordinate with details 16 and 17/A-7. Reference Section 103.2.3, UPC 2003. 4. Clarify the intent of Detail 18/A-7. Show the slope and size of the conductors. Clarify the routing of the roof drain conductor: inside or outside of the building wall? Reference Section 103.2.3, UPC 2003. 5. Coordinate the location of the roof drains with the low points of the roof. Reference Section 1101.11.1, UPC 2003. 6. Show the size of the roof drains on the drawing. Reference Section 103.2.3, UPC 2003. 7. Indicate the termination of the roof leaders. Reference Section 103.2.3, UPC 2003. |
| 01/04/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the submitted energy code calculations to demonstrate that the building meets the requirements of ASHRAE/IESNA 90.1-2001 or Chapter 8, IECC 2003. Reference Section 701.1, IECC 2003. 2. Additional energy calculations for mechanical systems and lighting will be required when tenant improvement designs are submitted. Reference Section 302.3, Uniform Administrative Code, 1997. |
| 01/04/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 01/12/2006 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | The site plan must be approved before the building plan can be approved. Show how roof drainage will be directed under adjacent sidewalks. |
| 01/18/2006 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 01/23/2006 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 02/03/2006 | TERRY STEVENS | ZONING | REVIEW | Denied | 02/08/06 Development Services Department Zoning Review Section Terry Stevens Lead Planner Building Plans: T05CM06363 & T05CM06409 Comments: 1. Zoning will review and approve the building plans once the site plan has been approved. Two approved and stamped copies of the approved site plan, landscape and NNPO plans must be included with the building plans. 2. Zoning will review and approve the building plans once the structural and commercial reviewers have approved the building plans. If you have any questions about this transmittal, please call Terry Stevens, (520) 791-5550 ext. 2000. |
| 12/27/2005 | JIM EGAN | FIRE | REVIEW | Denied | 1. Provide correct code review checklists. 2. Provide complete fire sprinkler system design criteria on plan. 3. Indicate fire ratings for north exterior wall of "existing medical building" and south exterior wall of "new shell building." Indicate opening protectives for new and existing openings. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/08/2006 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 02/08/2006 | SUE REEVES | REJECT SHELF | Completed |