Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T05CM06298
Parcel: Unknown

Address:
550 N 5TH AV 09

Review Status: Active

Review Details: POST 3RD PARTY REVIEW

Permit Number - T05CM06298
Review Name: POST 3RD PARTY REVIEW
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
04/14/2006 MARTIN BROWN FIRE REVIEW Denied Provide complete sprinkler design criteria on plans
1) Identification of hazard classification of the occupancy, including any special hazards.
2) The standard to be used for fire protection.
3) The availability and adequacy of the water supply (static pressure, residual pressure, GPM)
4) Design density and area of operations.
04/17/2006 PATRICIA GILBERT ENGINEERING REVIEW Denied Development Plan/Tentative Plat revisions must be approved prior to building plan approval. When the Development Plan/Tentative Plat has been approved (stamped and signed) by the CDRC manager, a site permit application (yellow card) must be walked through for "Site Plan,"approval (stamped and signed) by the Zoning, Landscape and Engineering Sections, prior to building plan approval.
04/17/2006 ROBERT SHERRY WATER REVIEW Approved
04/19/2006 GERRY KOZIOL WWM REVIEW Denied NEEDS TO PERMIT ON-SITE PRIVATE SEWER - NEEDS DEQ REVIEW & APPROVAL TO CONSTRUCT PRIVATE SEWER - NEEDS 2-MANHOLE CONSTRUCTION PERMITS
NEEDS WATEWATER 8TH FLOOR CREDIT EVALUTATION
05/10/2006 DAVID RIVERA ZONING REVIEW Denied 05/10/06

Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:

1. Zoning has reviewed the building plans but cannot approve them at this time.

2. A site card (yellow card) with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the CDRC approved tentative plat/development plan, landscape and NPPO plans are to be submitted with the grading plan packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The tentative plat/development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval.

3. Zoning will re-review to ensure compliance with the approved site plan and approve if applicable the building plans on the next submittal provided the stamped and approved site plans are included with the building plan package and the building structural portions of the plan review have been approved. See comment 2 for additional info regarding the site plan process.

Final Status

Task End Date Reviewer's Name Type of Review Description
05/11/2006 SUE REEVES REJECT SHELF RECEIVED