Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T05CM05910
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/30/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Adjust the sizes of the water pipes to reflect your submitted calculations. 2. Show the route and termination point of the T&P relief for WH-1. 3. Provide the developed length of the gas piping to justify the pipe sizing. Use the gas INPUT to the A/C units for all sizing. 4. Provide cleanouts for P-6 and for P-2 (in the main teatment room). 5. Provide a listing for P-5. 6. Provide a detail showing how the water heater and expansion tank are to be installed. 7. Provide pipe insulation and heat traps for the water heater per Section 804, IECC 2003. 8. Show how the hot water temperature is to be limited to 90 degrees F per Section 804.3, IECC 2003. |
11/30/2005 | ROBERT SHERRY | WATER | REVIEW | Approved | |
11/30/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Clarify the manner of returning air to the A/C units; ducted or plenum return? 2. Revise the outside air calculations for the A/C units serving multiple spaces per Section 403.3.2, IMC 2000. 3. Revise the duct insulation per Section 803.2.8, IECC 2003. 4. Clarify how the scheduled OSA for the three A/C units provides the calculated ventilation requirements. |
12/06/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T05CM05910 12/605 1. On Sheet E1.1, change the wording in the note from "NEC 517.12" to read "NEC 517.13." 2. Provide maintenance receptacles for the new Heat Pumps. Reference NEC 210.63. 3. Water Heater as listed on Sheet P1.1 is powered only on 240V. Power provided on Sheet E0.1 is 208V. Coordinate with Mechanical and clarify. 4. Plot the Water Heater on the Electrical Power Plan. 5. 4500KW WH, on 208V as indicated on panel schedule, would draw 21.63A. The 20A CB would not allow it to start. 6. It appears that Ckt 31,33,35 should have 2232 VA, not 1393. 7. It appears that Ckt 31,33,35 should have 2232 VA, not 1733. 8. It appears that Ckt 38,40,42 should have 3960 VA, not 2167. 9. Size the feeder to New Panel A. 10. Provide service load calculations. 11. 10 KAIC is the load side Circuit Breaker rating per the note on series rating, Electrical One Line Diagram. New Panel MCB is rated 22K. Please clarify. 12. Update the Code references in the series rating note on the Electrical One Line Diagram. They are 1999 numbers, and we now enforce the 2002 NEC. |
12/06/2005 | GBONILL1 | WWM | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/06/2005 | GBONILL1 | OUT TO CUSTOMER | Completed |