Permit Number: T05CM05750
Parcel: 117065950

Address:
459 S 3RD AV

Review Status: Completed

Review Details: RESIDENTIAL BLDG/WWM

Permit Number - T05CM05750
Review Name: RESIDENTIAL BLDG/WWM
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/18/2005 GERRY KOZIOL WWM REVIEW Approved
12/14/2005 STANTEC 2ND PARTY REVIEW REVIEW Denied December 14, 2005


To: City of Tucson Development Services Department
201 N. Stone Avenue, First Floor
Tucson, AZ 85701
Attn: David Mann, P.E., Building Code Division

Cc: DeCook Drafting & Design
6180 W. Peregrine Way
Tucson, Arizona 8574501

Re: Custom Model Plan – Zeh LifeWise
City of Tucson No. T05CM05750
Stantec Project No. 816-30015-01 (071)




Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back-check time, we request that you please provide revised plans and calculations, highlighting any changes, along with a written response to each of the noted items indicating the action taken.

SCOPE OF REVIEW:

The scope of this review covers residential plan review of the Architectural, Structural, Plumbing, Mechanical, Model Energy and Electrical codes. All code references are to the 2003 International Residential Code (IRC) except for plumbing, which is to the 1994 Arizona Uniform Plumbing Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

ARCHITECTURAL:

The depicted sidelight windows units ‘B, D, & M’ are required to be safety glazing per {IRC Sec. [B] R308.4 Hazardous Locations, Note #6}. Not denoted.

The depicted bathroom windows units ‘8 & 6’ are required to be safety glazing per {IRC Sec. [B] R308.4 Hazardous Locations, Note #5}. Not denoted.

Show the calculation of attic ventilation area required and note the location of all vents needed to comply [2003 IRC Sec. R806.2] or the type of alternate methods selected.

STRUCTURAL:

Upon second submittal provide the manufacturer’s schedule or joist calculations for support of the denoted ‘I’ joist sizes as correct.

Provide the hardware type to be used at all connections depicted on sheet #4 and sheet #7/ of 11.

Depict detailing of ‘I’ joist structural blocking and joist attachment to top plate at porch/house framing, section ‘A-A’.

Provide the method(s) used to size the denoted window headers, window lintels and porch beams on the framing plan(s). Provide a gravity load calculation for these beams and headers if the denoted openings or spans and propriety manufacture exceed the sizes or are not referenced in the span tables of the 2003 IRC.

PLUMBING PLANS:

The delineation of the piping plan and waste plan is too sparse on the information depiction. Better graphics along with a more accurate depiction is requested.

Denote actual field route of the ‘TPR’ line to daylight. Denote special construction issues to transverse the masonry segment of the route.

Denote the code-required locations of CO’s in this design presentation addressing [20003 IRC Sec.’s P3005.2 thru P3005.2.11 Drainage pipe cleanouts].

Provide the manufacturer’s listing for the denoted ‘Studor’ air admittance valves depicted on the plan rating them for their proposed use.

Provide compliance detailing for the mounting height of the “stack use “of the air admittance valve per [2003 IRC Sec. P3114.4] - 6” above flood rim and the ability to access the valve per [2003 IRC Sec. P3114.5]. A waste piping isometric to match the plan use of air admittance valve venting. Coordinate.
Locations at the water closets, laundry, double lavatory and kitchen sink are in question.

Provide the manufacturer’s cut sheets for the on-demand electric water heater unit to be placed in this home. Provide a hot water flow analysis to prove the gpm required by the house is met by the unit’s performance specifications.

Provide the unit specifications to the “holding tank” and depict accurate detailing on how the unit is interconnected to the HW distribution system. Not found.

The reviewer questions the inclusion of the note ending with “ROC #138185”? Provide commentary.

MECHANICAL PLANS:

The master bedroom shower alcove is required to be provided with a separate exhaust fan in addition to the one located in the toilet compartment.

The half-bath is required to be provided with a separate exhaust fan.

Provide the manufacturer’s specification sheet on the proposed heat pump unit. If this is a 3.5 ton heat pump the designed delivery denoted to the individual rooms exceeds the capacity of the typical unit’s range.

The laundry room as depicted does not denote supply air to the room. Correct oversight.

ELECTRICAL PLANS:

Denote the wiring provisions required by the electrical on-demand water heater system.

The master bedroom shower alcove is required to be provided with a separate exhaust fan in addition to the one located in the toilet compartment.

MODEL ENERGY CODE:

There are no comments to address.


-End of Review-

If you have any questions, please call (520) 750-7474.


Sincerely,
Stantec Consulting Inc.




Steven L. Nygren, R.A.
Senior Plans Examiner

SLN:js

Final Status

Task End Date Reviewer's Name Type of Review Description
12/19/2005 JMORALE1 OUT TO CUSTOMER Completed
12/19/2005 SUE REEVES REJECT SHELF Completed