Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T05CM05703
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/09/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 12/12/05 ACTIVITY NUMBER: T05CM05703 PROJECT NAME: ELEVATOR PROJECT ADDRESS: 6300 EL. DORADO PLAZA ARCHITECT / ENGINEER: PHIL SWAIM PROJECT REVIEWER: CHRISTY FOREMAN TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1) 1997 Uniform Administrative Code - section 302.5 Inspection and Observation Program. When special inspection is required by Section 306, the architect or engineer of record shall prepare an inspection program which shall be submitted to the building official for approval prior to issuance of the building permit. The inspection program shall designate the portions of the work to have special inspection, the name or names of the individuals or firms who are to perform the special inspections and indicate the duties of the special inspectors. The special inspector shall be employed by the owner , the engineer or architect of record, or an agent of the owner, but not the contractor or any other person responsible for the work. When structural observation is required by Section 307, the inspection program shall name the individuals or firms who are to perform structural observation and describe the stages of construction at which structural observation is to occur. The inspection program shall include samples of inspection reports and provide time limits for submission of reports. 2) Shop drawing for elevator need a reviewed and approval stamp by Architect. 3) Sht. A1.0 clarify note 7 that existing masonry can carry new load of access platform for elevator. 4) Page 5 of 6 special note of shop drawings. Clarify / justify wind loading effects are not considered in these calculations. Consult manufacturer. 5) See table 407.4.1 ANSI A117.1 2003 minimum dimensions of elevator cars it appears the elevator car does not meet these standards. 6) Shop drawing states side walls / guard rails will be detailed by others. Detail 4/A1.0 states to see shop drawings. Clarification / justification of guardrail needs to be provided per 1607.7.1 handrails and guards. 7) Per 2003 IBC - justify per ASCE 7-02 see sht. 2 structural calculations. |
12/23/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/28/2005 | JMORALE1 | OUT TO CUSTOMER | Completed |
12/28/2005 | SUE REEVES | REJECT SHELF | Completed |