Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T05CM05389
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/24/2005 | HEATHER THRALL | ZONING | REVIEW | Approved | |
10/24/2005 | JOSE ORTIZ | ENGINEERING | REVIEW | Approved | |
10/25/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Provide valuation / cost of construction. 2) Clarify existing restroom meets ANSI a117.1 2003. Show dimensions and clear floor space. If it is not fully accessible 20% of the cost of construction needs to be spent towards meeting accessibility requirements per chapt. 34 2003 IBC. 3) Elevation for HC fitting room missing detail bubble sht. A.1 calls out A.4 elevations shown A.5. 4) Clarify hgt per ANSI A117.1 of coat hooks elevation B, sht. A.5. 5) Bench elevation C sht. A.5 per 903.4 ANSI A117.1 2003. 6) Dimension light switch hgt. per ANSI A117.1 sht. A.5 elevation A. 7)Provide wall section for new interior wall. |
10/25/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
10/25/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T05CM05389 10/25/05 1. General Note 1 modify to reference NEC2002, not 1999. 2. Show 1.25% for continuous load and largest motor on panel schedule. Note that connected load appears to be 27900 VA, not 26800. |