Permit Review Detail
Review Status: Completed
Review Details: CELL TOWER/ANTENNAS
Permit Number - T05CM05372
Review Name: CELL TOWER/ANTENNAS
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/26/2005 | ALINE TORRES | PLANNING-CITY HALL | REVIEW | Approved | |
10/31/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
11/06/2005 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
11/08/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. It appears that the intent is to provide a single-phase panel as Panel A. Please clarify on the panel schedule itself, which indicates that this is 3 phase. 2. Specify the number of poles for the new Circuit Breaker on the transformer primary. 3. Specify the fault current rating for this Breaker. Note that TEP Available Fault Current for a 480/277V service 800-1600A 32,600 AFC, unless their Engineer tells you otherwise. 4. Circuit A-16,18, on a 40A CB, has no load. Please clarify. |
11/11/2005 | CRAIG GROSS | ZONING | REVIEW | Approved | |
11/22/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 11/23/05 ACTIVITY NUMBER: T05CM05372 PROJECT NAME: Verizon Wireless PROJECT ADDRESS:. 6245 E. Broadway Bl ARCHITECT / ENGINEER: Kenneth Camp PROJECT REVIEWER: Christy Foreman TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1) Sht. A-3 conflicts with sht. A-2. Note on A-3 specifies new 6'-0" antenna mounted to existing parapet sht. A-2 specifies 8'0". 2) Sht. A-3 conflicts with Sht. A-2. Note on A-3 specifies new verizon wireless equipment cabinet on new platform. Sht. A-2 specifies new equipment cabinet mounted to existing platform. 3) Special Inspection form for field welding will need to be submitted before permit can be issued. 4) Please provide drawing with structural calculations clarifying location of each additional load being justified. 5) Please justify / clarify IBC 2003 code section for acceptable increase specified on page 2 of structural calculations. |
11/25/2005 | JAY HOGAN | OPERATIONS | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/13/2005 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
12/13/2005 | SUE REEVES | REJECT SHELF | Completed |