Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T05CM05332
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/08/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1) CLARIFY LOCATION, DISTANCE TRAVELED, AND ACCESSIBILTY OF RESTROOM FACILITIES. RESTROOMS APPEAR TO NOT BE ACCESSIBLE. CHAPT 3409.6 CLARIFY 20 % COST OF CONSTRUCTION IS BEING SPENT TOWARDS METTING ANSI A117.1 2003. 2) PROVIDE FULL WALL SECTION FOR EACH CONDITION AND CLARIFY LATERAL BRACING IF REQUIRED. PROVIDE FLOOR BRACING FOR WALLS THAT ARE NOT FULL HEIGHT. PROVIDE STRUCTURAL CALCS. TO JUSTIFY YOUR DETAIL. SEE SECTION 1621.1.2. |
11/08/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
11/08/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T05CM05332 11/2/05 1. With TEP peak demand of 185.5 KW, or 884.0 A at 0.85 pf, (884) (1.25) = 1105.0 A. 1105.0 + 97.1 = 1202.1 A. This overloads the 1200 A service. Reference NEC 220.35. Suggest that some of the items removed with demo be accounted for in your load calculations, and that the existing heaters be removed from the new load. 2. (3) 750 Al conductors have ampacity of (3) (385) = 1155 A, which is not sufficient for the 1202 A electrical load. |
11/08/2005 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
11/08/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
11/21/2005 | CAGUILA1 | WWM | REVIEW | Needs Review | |
11/21/2005 | CAGUILA1 | ZONING | REVIEW | Needs Review |