Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T05CM05124
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/11/2007 | WILDAN | 2ND PARTY REVIEW | REVIEW | Denied | April 11, 2007 City of Tucson Development Services P.O. Box 27210 Tucson, AZ 85726 RE: Residence Inn Marriott Deferred Truss Submittal – 3rd REVIEW CITY OF TUCSON LOG NO. T05CM05124-R WILLDAN PROJECT NO. 13881-7032 The third review for the above project has been completed. This letter contains comments which need to be addressed by written responses to each which indicate any actions taken. In order to facilitate a shorter fourth review, all corrections and revisions must be made on the original plans and two complete new sets of prints, along with one complete redlined set, must be returned to our office. To avoid delays, ensure that all corrections have been made, are complete, and have been coordinated on all applicable detail and note sheets, and that all changes have been highlighted with appropriate revision numbers, revision dates, and “cloud bubbles.” Pen or pencil corrections on final prints are not acceptable. This project has been reviewed for conformance with the 2003 IBC, 1997 UAC, 2003 IMC, 2003 IECC, 2002 NEC, and the 2003 UPC. Any revisions to this plan will require an additional review and approval by Willdan. Should you have questions regarding the comments herein, please contact your plans examiner John Tennant. Occupancy Occup. Load Construction Area S.F. Sprinklered Alarms N/A N/A N/A N/A N/A N/A Special Inspection is required for the following items: N/A The following items are acceptable for deferred submittals: N/A STRUCTURAL COMMENTS: Truss Calculations The truss calculations are to be reviewed and accepted by the engineer of record prior to submittal to the City of Tucson. Reference IBC Section 106.3.4.2. COMMENT REMAINS: Please address the comments from the architect/engineer of record as noted on the truss design drawings (i.e. deflection criteria exceeded). COMMENT REMAINS: The current submittal appears to be a combination of all the previous submittals. Please organize the submittal and clarify which items are the current submittal items and verify that the original comments have been addressed. Provide the truss layouts for each floor and roof corresponding to the truss calculations. Reference IBC Section 106.1.1. COMMENT REMAINS: Please revise those layouts that are illegible per section 106.1.1 of the 2003 IBC. COMMENT REMAINS: Please refer to the previous comment. Sincerely, WILLDAN Chris Kiel, C.B.O., M.C.P. Building Official CEK/tb |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/26/2007 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 04/26/2007 | SUE REEVES | REJECT SHELF | Completed |