Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T05CM04959
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/28/2005 | ANY | ENGINEERING | REVIEW | Approved | |
| 09/28/2005 | DAN CASTRO | ZONING | REVIEW | Approved | |
| 10/05/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | T05CM04959 9/30/05 1. Submit cut sheet information sufficient to demonstrate that New WH is cord connected, or provide a disconnect per NEC 422 Part III. 2. Panel Schedule A is shown as a 200A Panel with a 400A bus. This is not possible. 3. Panel A as a 200A panel, would be overloaded at 352A. 4. Account for continuous loads, and largest motor, on both panels. It is not clear whether loads indicated are demand loads, or merely connected loads. 5. 350 MCM Cu, ampacity 310A, is not sufficient for a load of 352 A as the Panel A feeder. 6. Provide a dedicated branch circuit for the signs. Reference NEC 600.5 (A). 7. Provide cut sheets, including power requirements, for new signs. 8. Provide a disconnect for the signs per NEC 600.6. 9. Specify conduit and conductor size and type. |
| 10/11/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
| 10/11/2005 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 10/11/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 10/14/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
| 10/14/2005 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 10/14/2005 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approved |