Review Date Reviewer's Name Type of Review Description Status Comments
09/23/2005 JIM EGAN FIRE REVIEW Approved
09/23/2005 GERRY KOZIOL WWM REVIEW Approved
09/23/2005 HEATHER THRALL ZONING REVIEW Approved
09/23/2005 PATRICIA GILBERT ENGINEERING REVIEW Approved
09/26/2005 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Clarify the type of water closet being installed; tank or flush valve.
2. A backflow preventer located greater than 5 feet above the floor level requires an access platform. Reference Section 603.2.3, UPC 1994.
3. Confirm the water pressure calculations for water pressure range and the water pressure drop for the backflow preventer.
4. Resize the gas piping to the rooftop A/C units per Table 12-3, UPC 1994.
5. Provide water and waste & vent riser diagrams.
6. Provide an upper terminal clean out for P-1 and a cleanout for the mop sink, P-3. reference Section 707.4, UPC 1994.
09/26/2005 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied T05CM04883 9/26/05

1. Plumbing Plans should specify electrical requirements for new EWH.
2. Eliminate extra loads Panel Schedule B 23612, 21362, 19612.
3. Eliminate redundant grounds between the new service disconnects and the CT Can, and between the CT can and the 2000A Termination can. NEC 250.24 (B).
4. Document source for the 65,000 AIC at the service. According to TEP SR-510 this should be 75,000A, and future projects may refer to this figure.
5. Provide location of service on scaled drawing.
09/26/2005 ROBERT SHERRY WATER REVIEW Approved
09/26/2005 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide a minimum of 75 CFM ventilation per water closet for each restroom. Reference Section 403.3 IMC 2000.
2. Show the size, material, routing, and termination of the condensate drains from the roof top A/C units.
09/27/2005 DAVID BELL LANDFILL REVIEW Approved
09/27/2005 CHRISTY FOREMAN BUILDING-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
09/27/2005 KMEDINA1 OUT TO CUSTOMER Completed