Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T05CM04591
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/06/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
| 09/06/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Coordinate the fixture identification numbers with the drawings. (e.g. P-13 or P-7. P-5 and P-6) 2. Show the size of the trap arm for P-7 (P-13). 3. Show the size of the runout for P-3. 3/4" copper is too small for a urinal. 4. Revise the flowrate demand as noted in the water calculation to comply with Section 610.1, UPC 1994. |
| 09/06/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1) CLARIFY LOCATION OF THE FOLLOWING DETAILS SK1/A1.0, 13/A2.0, 14/A2.0. 2) CLARIFY ELEVATIONS FOR OFFICES WITH WINDOWS. 3) CLARIFY ROOF FRAMIMG WAS DESIGNED FOR HVAC OR PROVIDE STRUCTURAL CALCULATIONS. |
| 09/06/2005 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 09/06/2005 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 09/06/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Specify the R-value for the duct insulation. 2. The use of ASHRAE 62n for ventilation calculations has not yet been adopted by the COT. Calculate the ventilation ising Section 403, IMC 2000 or submit an appeal to the building official. |
| 09/06/2005 | DAVE MANN | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 09/06/2005 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
| 09/28/2005 | KMEDINA1 | WWM | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/28/2005 | KMEDINA1 | OUT TO CUSTOMER | Completed |