Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE
Permit Number - T05CM04322
Review Name: RESUBMITTAL - SITE
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/11/2007 | HEATHER THRALL | ZONING | REVIEW | Denied | TO: Development Services Department Plans Coordination Office FROM: Heather Thrall Senior Planner PROJECT: T05CM04322 900 S. Pantano, New City of Tucson Linear Park Commercial Site Plan, 3rd Review TRANSMITTAL DATE: January 11. 2007 COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. (per last review) Per DS 2-08.5.1.A, all sidewalks must be a minimum of 4' in width and installed to avoid any obstruction that decreases the required width. On Sheet SD-8, the 4' wide sidewalks are perpendicular to parking spaces - and these parking spaces can overhang into the sidewalk. Please provide a 6'6" wide sidewalk to allow a 2'6" vehicular overhang - OR- provide a wheel stop barrier within the parking spaces abutting sidewalks. The wheel stop must be contained within 2'6" of the front of the space. RESPONSE; indicates that wheels stop barriers will be provided along west parking abutting sidewalk - thank you. Need them at the north sidewalk too -as the sidewalk there is only 5' wide and a 2.5' vehicle overhang will not render enough room. PLEASE SEE ENGINEERING FOR PARKING IN THE RIGHT OF WAY. PLEASE SEE MARTY DUPONT FOR ADA COMMENTS. I AM WILLING TO MEET YOU AT THE COUNTER TO SEE THESE CHANGES. Email me for an appointment at Heather.Thrall@tucsonaz.gov or call me at 791-4541x1156. I will also review the building plans at that time. HCT C:\planning\site\DSD\T05CM04322 900 s pantano park 4th.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan |
03/15/2007 | FSANCHE1 | ENGINEERING | REVIEW | Needs Review |