Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T05CM04309
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/26/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
| 08/26/2005 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/26/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
| 09/07/2005 | GERRY KOZIOL | WWM | REVIEW | Passed | |
| 09/19/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Demonstrate comliance with the Tucson Lighting Code, http://www.tucsonaz.gov/dsd/Codes___Ordinances/Tucson_Lighting_Code.pdf. 2. Since the deductive alternate consists of AC powered lighting fixtures, provide a panel schedule with load tabulation for Panel HP. 3. Provide catalogue cut sheets for all photovoltaic equipment, including but not restricted to the solar panel, panel mounting, the battery, the controller, and the enclosure. 4. Provide Structural Calculations, sealed by a Registered Structural Engineer, sufficient to demonstrate that the pole and anchor bolts are sufficient for the solar panel wind loading. Structural/Building Plans Examiner will evaluate. 5. Regarding Keynote 19, Sheet E1.0, if the pullbox is part of the work in a previous Phase, it should be noted as "Existing" for the purposes of this permit. 6. Regarding Keynotes 34, 38, 39 and all others which may apply, provide a panel and circuit, and accounting in load calculations for the new signing if part of this project. If the intent is to have the signing be done by others, or to be done under a separate permit, or to be future, indicate such on the plans. 7. This won't effect the current Electrical Permit, but (3) sets of 250 MCM may not be adequate for an 800A service. Fault calculations are fine, but they would appear to apply to future projects, when the new service entrances are to be designed and constructed. |
| 09/21/2005 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 09/27/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 8/12/05 ACTIVITY NUMBER: T05CM04309 PROJECT NAME: LIGHTING PROJECT ADDRESS: 9314 E. RITA RD. ARCHITECT / ENGINEER: RS ENGINEERING 1) PROVIDE JUSTIFICATION / STRUCTURAL CALCULATION FOR INSTALLATION OF SOLAR PANELS. IF MOUNTED TO LIGHT POLE PROVIDE JUSTIFICATION / STRUCTURAL CALCULATIONS THAT LIGHT POLE CAN SUPPORT ADDITIONAL LOADS FROM THE SOLAR PANELS. |
| 10/06/2005 | DAN CASTRO | ZONING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/11/2005 | GBONILL1 | OUT TO CUSTOMER | Completed |
| 10/11/2005 | SUE REEVES | REJECT SHELF | Completed |