Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T05CM04276
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/28/2006 | DOUG LAAKSO | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 03/01/2006 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 03/02/2006 | PATRICIA GILBERT | ENGINEERING | REVIEW | Denied | Approved site plan is required prior to building plan approval. |
| 03/20/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 03/21/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The water pressure and water pipe sizing calculations incorrectly use a developed pipe length of 45 feet. The developed length from the water meter to the furthest outlet appears to be approximately 295 feet. The pipe sizes, however, appear to be adequate. Reference Appendix A, UPC 1994. 2. A 3" building sewer may not be installed with a slope less than ¼" per foot. (A 4" building sewer is allowed to have a slope as low as 1/8" per foot if a slope of ¼" per foot is impractical due to the depth of the public sewer or structural conditions.) Reference Section 718.1, UPC 1994. |
| 04/21/2006 | TERRY STEVENS | ZONING | REVIEW | Denied | 04/22/06 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: Two copies of the approved and stamped site plan required prior to approval of the building plan. Zoning will re-review the building plans on the next submittal to ensure compliance with the approved site plan. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/26/2006 | GBONILL1 | OUT TO CUSTOMER | Completed |