Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T05CM04242
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/05/2006 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Passed | |
01/17/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Note on Sheet A 01 refers to electrical plans. Provide such electrical plans with next submittal. |
01/18/2006 | GERRY KOZIOL | WWM | REVIEW | Approved | |
12/20/2005 | TERRY STEVENS | ZONING | REVIEW | Denied | 12/20/05 Development Services Department Zoning Review Section Terry Stevens Lead Planner Building Plans: T05CM04242 Comments: 1. Building elevations and a floor plan must be provided in order to complete the zoning portion of the building review. 2. Zoning will review and approve the building plans once the structural and commercial reviewers have approved the building plans. 3. This review can be done over the counter. Please contact me to set an appointment. If you have any questions about this transmittal, please call Terry Stevens, (520) 791-5550 ext. 2000. |
12/21/2005 | JIM EGAN | FIRE | REVIEW | Denied | A minimum 20 feet wide, paved, fire access roadway must be provided and extended to within 150 feet of all portions of the exterior walls of all structures. An approved turnaround is required for dead-end access roadways. |
12/28/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide justification for connecting the drainage system of the new modular building to the building drain of the existing building. Reference Section 312.0, UPC 1994. 2. Show the size, inverts and slope of the both the proposed building sewer (from the modular building) and the existing building drain on the drawing. The slope of the building sewer shall be at least ΒΌ" per foot unless it is shown to be impractical due to the depth of the public sewer or structural conditions. Reference Sections 103.2.3 and 718.1, UPC 1994. 3. Show the location of the cleanouts in the building sewer. Reference Section 719.1, UPC 1994. 4. Show how the new water piping relates to the existing water supply system and show that the additional connections do not cause the existing piping to be overloaded. Reference Section 101.5.1, UPC 1994. 5. Provide CW shut off valves for each building entrance. The valves shall be accessible at all times and arranged so that the water service to the individual buildings can be controlled. Reference Section 605.3, UPC 1994. |
12/28/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
12/28/2005 | ROBERT SHERRY | WATER | REVIEW | Approved | |
12/30/2005 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | The building plan cannot be approved until the site plan has been approved. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/26/2006 | JMORALE1 | OUT TO CUSTOMER | Completed |
01/26/2006 | SUE REEVES | REJECT SHELF | Completed |