Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T05CM04185
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/12/2006 | JIM EGAN | FIRE | REVIEW | Approved | |
01/13/2006 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approved | |
01/17/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The water calculation note on sheet M4 addresses pipe locations but does not consider either pipe sizes or the water pressure available for friction in the existing water system. Show how the new water piping relates to the existing water supply system and show that the additional connections do not cause the existing piping to be overloaded. Reference Section 101.5.1, UPC 1994. 2. The water calculation note on sheet M4 addresses pipe location but does not provide any information regarding the water pressure available for friction in the existing water system. Show how the new water piping was sized. 3. The existing cleanout is still shown opening opposite the direction of flow. Clarify the direction of flow of the building drain as shown in detail 1/M2. Reference Section 707.6, UPC 1994. |
01/17/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the balancing information per Section 403.3.2, IMC 2000. 2. The basis for requiring a Type I hood is the capability of the range to produce smoke and grease-laden vapors (e.g. when warming bacon). Provide an approved appeal to the building official acknowledging the range for "warming only" or install a Type I Hood, along with a source of make up air, for the kitchen. Reference Section 507.2.2 IMC 2000. |
01/26/2006 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
01/28/2006 | PETER MCLAUGHLIN | ZONING | REVIEW | Approved | Zoning Review may not approve the building plans prior to site plan approval and Structural review approval of building plans. |
02/06/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/09/2006 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
02/09/2006 | SUE REEVES | REJECT SHELF | Completed |