Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T05CM04182
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/13/2006 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approved | |
01/17/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. According to the architect, sheet M3 is not part of the current drawing set. The water calculation note on sheet M4 addresses pipe location but does not consider either pipe sizes or the water pressure available for friction in the existing water system. Show that the new water piping for the drinking fountain and the future portable building will not cause the existing piping to be overloaded. Reference Section 101.5.1, UPC 1994. |
01/17/2006 | JIM EGAN | FIRE | REVIEW | Approved | |
01/28/2006 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | Zoning Review may not approve the building plans prior to site plan approval and Structural review approval of building plans. |
01/30/2006 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
02/06/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/09/2006 | DELMA ROBEY | APPROVAL SHELF | Completed |
02/09/2006 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
02/09/2006 | DELMA ROBEY | REJECT SHELF | Completed |