Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T05CM04096
Review Name: OTHER
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/22/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Add HP C4-C to Circuit C-19,21,23 on Panel Schedule. 2. CB 70/3 Ckt C-19,21,23 is offset one space on Panel Schedule. 3. One of the A/C units on Building B needs to be re-labeled as "B2-C". B4-A is used twice. 4. It appears that Keynote 9 is used inappropriately on Building D in a few places. Conduit is marked as J-Box. I believe Keynote 7 fits the intent. 5. HP D3-A is used twice on Bldg D. 6. Three of the A/C units on Bldg D do not have a connection to any circuit, on Electrical Plan Building D. 7. HP D8-A is shown on Bldg D. No such HP this project. 8. Please mark Building E as such on the plan view layout. 9. Check correspondence between A/C Equipment Schedule and field installation per building plans. B2-C and D1-8 are on the Schedule but not the plans. D3-8 is on the plans but not the schedule. 10. The disconnect on Building A appears to violate the requirements of NEC 225.30. 11. New Panel AC Building B appears to violate the requirements of NEC 225.30. 12. The disconnect on Building D appears to violate the requirements of NEC 225.30. 13. The disconnect on Building A appears to violate the requirements of NEC 225.30. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/23/2005 | SUE REEVES | REJECT SHELF | Completed |