Review Date Reviewer's Name Type of Review Description Status Comments
07/29/2005 JIM EGAN FIRE REVIEW Approved
07/29/2005 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Complete the plumbing plans and schedules.
2. Provide information regarding the vacuum system.
3. Clarify the basis of the water pressure calculations. Reference Section 610.4, UPC 1994.
07/29/2005 CHRISTY FOREMAN BUILDING-COMMERCIAL REVIEW Approved
07/29/2005 ROBERT SHERRY WATER REVIEW Approved
07/29/2005 HEATHER THRALL ZONING REVIEW Approved
07/29/2005 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Revise the outside air calculation to comply with the requirements of Section 403.3, IMC 2000. Justify the classifications of the individual rooms per Table 403.3, IMC 2000.
2. Revise the duct insulation to comply with Chapter 8, IECC 2000.
07/29/2005 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied T05CM03993 7/29/05

1. Clarify power requirements of New Lighting Fixture 1.
2. On the Electrical Lighting Plan, clarify which lighting fixture is represented by the small circular symbol.
3. Provide total load on Panel A, not just new load.
4. Note that the divisor for a 120V circuit is 120, not 180.
5. Add the following note in a prominent place on the plans: "All wiring in patient care areas shall be installed in accordance with the requirements of NEC 517.13."
6. Plumbing plans Sheet P1.1 shows a Water Heater Schedule which is not filled. Clarify intent on P1.1 and electrical plans.
7. Plumbing Comment #2 addresses a vacuum system. If such system needs electrical power, provide for such on electrical plans.
8. Panel A has an X-Ray on Ckt 37/39. Show such equipment on the plans.
07/29/2005 LOREN MAKUS ENGINEERING REVIEW Approved
08/02/2005 JMORALE1 WWM REVIEW Needs Review