Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T05CM03307
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/05/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
07/05/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1) PROVIDE LOADS, CALCULATIONS AND STRUCTURAL DETAIL FOR INSTALLATION OF KITCHEN HOOD. |
07/05/2005 | DAN CASTRO | ZONING | REVIEW | Approved | |
07/05/2005 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
09/26/2005 | GBONILL1 | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
09/26/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T05CM03307 7/5/05 1. Minimum font size is 10 point, or 1/8". 2. Put load on panel schedule for A-23. 3. Coordinate with Mechanical for new Heat Pump. All Mechanical indicates is 2.6 FLA, which would be low. Electrical counts a total of 9880 VA, which would draw more than the 30A OCPDs would allow. 4. Please check loading on MAU-1. It apparently draws 25A according to the panel schedule, yet is protected by a 20A CB. 5. Please check loading on EF-1. It apparently draws 28A according to the panel schedule, yet is protected by a 20A CB. |
09/26/2005 | GBONILL1 | WWM | REVIEW | Needs Review | |
09/26/2005 | GBONILL1 | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
09/26/2005 | GBONILL1 | WATER | REVIEW | Needs Review |