Permit Number: T05CM03307
Parcel: 130171470

Review Status: Completed

Review Details: REVISION - - 1ST

Permit Number - T05CM03307
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/14/2006 CHRISTY FOREMAN BUILDING-COMMERCIAL REVIEW Denied CITY OF TUCSON DEVELOPMENT SERVICES
STRUCTURAL REVIEW COMMENTS

DATE: 6/14/06
ACTIVITY NUMBER: T05CM03307
PROJECT NAME: La Fresita
PROJECT ADDRESS:1655 S. Alvernon Way
ARCHITECT / ENGINEER: Paul M. O'Connor
PROJECT REVIEWER: Christy Foreman


TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS.

1) It appears walk-in freezer & refrigerator at back of building are new. If these are new please justify per code additional sq. footage per the IBC 2003. Structural calculations and drawings will be required if this is new square footage. Walk-in coolers still shown on electrical drawings. Please clarify scope of work.

2) Locate structural details SK1-SK4 on sht. 1 of 6 of structural calculations.

3) Provide and locate details SK1-SK4 on permit set. Show details on architectural drwgs. or provide structural drawings as a part of permit set.
06/15/2006 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Detail 4/P2 has been modified to call for a new water heater to be mounted on the floor; keynote 4/P1, however, still calls for the water heater to be mounted above the ceiling. Please coordinate. Reference Sections 103.2.3 and 511.2, UPC 1994.
2. Insulate the first 8 feet of the supply and discharge piping of the water heater per Section 804.5, IECC 2003.
06/15/2006 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Coordinate the hood design elements as shown in the keynotes, exhaust hood calculations, and the mechanical floor plan (e.g. Exhaust hood 10' x 3', or 12' x 4'?).
2. Revise the installation of the hood to provide 18" of clearance between the hood and combustible construction. Note that wood studs covered by gypsum board and a sheet of stainless steel is considered combustible construction by the IMC (e.g. the north partition can be made with wood studs per keynote 21/A2). Reference Section 507.9, IMC 2000.
3. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference Section 803.2.8, IECC 2000.

Final Status

Task End Date Reviewer's Name Type of Review Description
06/26/2006 ADRIANNE OLIVO OUT TO CUSTOMER Completed
06/26/2006 SUE REEVES REJECT SHELF Completed