Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL-BLDG/FIRE/ZONING/ENG
Permit Number - T05CM03253
Review Name: COMMERCIAL-BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/01/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide equipment data for the control room and chlorine room air conditioners. 2. Provide equipment data for the chlorine room exhaust fan. 3. Show how the chlorine room meets the requirements of Sections 501.3, 502, and 510, IMC 2000. 4. Provide updated energy code compliance calculations. Reference Section 101.3, International Energy Conservation Code 2000. |
| 08/01/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide the location and size of the RPBP assembly. Reference Section 103.2.3, UPC 1994. 2. Provide information on the pressure setting for the pressure-reducing valve serving the eyewash and the sampling valve. Reference Section 608.0, UPC 1994. 3. Provide an accessible dielectric connector between the copper water piping and the galvanized steel pipe (detail 1/sheet 10). 4. Clarify how the wastewater from the eyewash is to be handled (Note #2, Detail 1/10) without surface runoff or causing a nuisance. Reference Section 303.0, UPC 1994. |
| 08/01/2005 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/14/2005 | GERRY KOZIOL | WWM | REVIEW | Passed | |
| 08/29/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Demonstrate compliance with Tucson Lighting Ordinance, http://www.tucsonaz.gov/dsd/Codes___Ordinances/Tucson_Lighting_Code.pdf. |
| 08/31/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 9/1/05 ACTIVITY NUMBER: T05CM03253 PROJECT NAME: CONTROL BUILDING PROJECT ADDRESS: 5980 s. 12TH AV ARCHITECT / ENGINEER: MARK TAYLOR PROJECT REVIEWER: Christy Foreman TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1) Provide dimensioned site plan with property lines and location of building on the site. 2) Provide soils report used for structural calculations. 3) Calculations need to be provided per 2003 IBC. |
| 09/07/2005 | DAN CASTRO | ZONING | REVIEW | Denied | 1. A site plan review is required for this project. Contact the permit clerk desk to obtain a site review card and necessary information regarding the site review. The building plans may not be approved by the Zoning Review Section prior to site plan approval. 2. A copy of the most recent approved site plan of the park shall be included with the site plan package for reference. The most recent approved site plan is required to verify new booster station will not interfere or obstruct with existing park amenities or land use code requirements. The proposed site plan shall be drawn in conformance with Development Standards 2-02. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/12/2005 | JMORALE1 | OUT TO CUSTOMER | Completed |
| 09/12/2005 | SUE REEVES | REJECT SHELF | Completed |